MRp1 Planning for Zero Waste Operations
Provide accessible recycling and special-waste arrangements and operational resources that support waste prevention.1
- Points
- Required
- Applies to
- ID+CBD+C
Reviewed · Spot an error? Report it
Points
Required prerequisite; no points. Missing organics service does not remove the storage requirement.1
Documents to prepare
Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.
- Preparation: Waste-stream and collection/storage plan
- Preparation: Special-waste handling arrangements
- Preparation: Operational waste-prevention and recycling resources
- Preparation: Photographs of final spaces with signage and a narrative of storage size, accessibility and expected volume
Worked example
Assume a space plan accommodates all six named material groups, with organics separate and the five nonorganic groups combined where local conditions require. The six-group coverage includes organics even if hauling service is not yet available; special-waste safety measures and operating resources remain necessary.1
Requirements
Provide collection and storage areas accessible to haulers, janitorial staff and occupants for organics/food waste, mixed paper, corrugated cardboard, glass, plastics and metals. Collection and storage may be separate; mixed nonorganic recyclables are acceptable where local conditions require.1
Reserve organics/food-waste storage even if collection service is unavailable at occupancy. Provide safe collection, storage and disposal measures for batteries, mercury lamps and electronic waste. Include design details, manuals or other resources to support operational waste prevention and recycling.1
FAQ
Sources
This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.
- LEED v5 ID+C Rating SystemJuly 2026 · MRp1; printed pp. 68-69, PDF pp. 73-74; scorecard printed pp. 1-2, PDF pp. 6-7
Maintained by VERTIQ, LEED software for consultants.