MRp1 Planning for Zero Waste Operations

Provide building-wide recycling infrastructure and operations guidance that support waste prevention after occupancy.1

Points
Required
Applies to
BD+CID+C

Reviewed · Spot an error? Report it

Points

Required for NC and Core and Shell; no points. Operational waste planning is distinct from construction-waste diversion.1

Documents to prepare

Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.

  • Building waste/recycling collection and storage layout
  • Waste-service and material-stream plan
  • Safe battery, mercury-lamp, and e-waste handling procedure
  • Operations waste-prevention/recycling manual and tenant guidelines where applicable
  • Photos of the final recycling spaces with signage, and a narrative of storage size, accessibility, and expected volume

Worked example

Assume a collection plan covers paper/cardboard, glass, plastics, metals, and safe special-waste handling but reserves no organics storage. Even if organics service is unavailable, that omission does not meet the prerequisite. No diversion-percentage calculation is specified here.1

Requirements

Provide dedicated collection/storage areas accessible to haulers, janitorial staff, and occupants for organics/food waste, paper, cardboard, glass, plastics, and metals. Mixed recycling can be acceptable for the listed non-organic materials where local conditions require it. Reserve organics storage even if service is unavailable at occupancy. Provide safe battery, mercury-lamp, and electronic-waste handling. Include design details, manuals, or other resources supporting high-performance waste prevention and recycling. Core and Shell communicates infrastructure and services in tenant guidelines.1

FAQ

Can organics storage be omitted when there is no local collection service?

No. Storage space is required even if service is unavailable at occupancy.1

Sources

This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.

  1. LEED v5 BD+C Rating SystemJuly 2026 · MRp1, printed pp. 126-127

Maintained by VERTIQ, LEED software for consultants.