IPc1 Integrative Design Process
Follow an early interdisciplinary design process or locate in a LEED-certified building.1
- Points
- 1 point
- Applies to
- ID+CBD+C
Reviewed · Spot an error? Report it
Points
1 point for either the integrative-process route or the LEED-certified-building route.1
Documents to prepare
Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.
- Preparation: Charrette participants, agenda and early-design records
- Preparation: Measurable three-impact-area goals incorporated in OPR
- Preparation: Base-building LEED certification if using the alternative route
Worked example
Assume an early charrette includes the owner and four key perspectives: architecture, construction, energy modeling and community engagement. Four perspectives meets the count condition. The team must still document the continuing interdisciplinary process and measurable OPR goals to earn the process-route point.1
Requirements
The process route starts in pre-design and continues into early occupancy. Convene an interdisciplinary team, provide equitable facilitation, hold an early charrette with the owner/representative and at least four key perspectives, and adopt measurable goals across all three LEED v5 impact areas in the OPR.1
The alternative route locates the project in a LEED-certified building. The Rating System does not state that both routes must be achieved.1
FAQ
Sources
This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.
- LEED v5 ID+C Rating SystemJuly 2026 · IPc1; printed pp. 9-10, PDF pp. 14-15; scorecard printed pp. 1-2, PDF pp. 6-7
Maintained by VERTIQ, LEED software for consultants.