IPc1 Integrative Design Process
Establish an interdisciplinary process early enough to shape project goals and system decisions, and continue the collaboration through early occupancy.1
- Points
- 1 point
- Applies to
- BD+CID+C
Reviewed · Spot an error? Report it
Points
NC and Core and Shell: 1 point for the complete process.1
Documents to prepare
Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.
- Integrated-team roster and facilitation plan
- Predesign or early-design charrette agenda and minutes
- Measurable goals and owner's project requirements
Worked example
Assume a charrette includes the owner, architect, contractor, energy modeler, and community-engagement representative. The four listed technical/community perspectives meet the minimum of 4, but attendance alone does not earn the point without the integrated process and documented goals.1
Requirements
Convene an integrated team with diverse perspectives and equitable facilitation. Hold a predesign or early-design charrette with the owner or representative and participants representing at least four key perspectives. Set measurable goals covering decarbonization, quality of life, and ecological conservation/restoration, and incorporate them in the owner's project requirements.1
FAQ
Does a late coordination meeting satisfy the timing requirement?
The charrette is required during predesign or early design, within a process that continues through early occupancy.1
Sources
This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.