EQp2 Fundamental Air Quality

Investigate outdoor air quality and provide compliant ventilation, filtration and entryway systems.1

Points
Required
Applies to
ID+CBD+C

Reviewed · Spot an error? Report it

Points

Required prerequisite; no points. Scope-specific filtration and measurement provisions do not waive the all-space ventilation obligation.12

Documents to prepare

Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.

  • Preparation: Outdoor-air investigation and ventilation calculations
  • Preparation: Filter or qualifying air-cleaner specifications and controls integration
  • Preparation: Outdoor-air measurement and entryway drawings
  • Preparation: Air quality test plan, occupant survey method and results, and air quality testing report if using the IAQ procedure

Worked example

Assume one in-scope mechanical ventilation system has an outdoor-air intake of 1,200 cfm. It exceeds the 1,000-cfm threshold by 200 cfm, so provide outdoor-air measurement for that system. Separately verify ventilation, filtration, entryways and applicable healthcare provisions.1

Requirements

Investigate regional and local outdoor air using ASHRAE 62.1-2022 Sections 4.1-4.3 and meet Sections 5-6 using the ventilation-rate, IAQ or natural-ventilation procedures, or a combination. ASHRAE 62.1-2022 applies to all project spaces even where HVAC is outside the project scope, including Section 6.1.4 outdoor-air treatment.12

Where the ventilation-rate or IAQ procedure is used, applicable central systems supplying regularly occupied spaces need MERV 13, ISO ePM1 50% equivalent, or qualifying tested in-room air cleaning. In-room systems must be integrated into building controls and systems. Provide outdoor-air measurement for in-scope mechanical systems with intake above 1,000 cfm. Healthcare spaces also follow applicable ASHRAE 170-2021 Sections 6-10.12

Install permanent dirt-capturing entryway systems at in-scope primary exterior entrances. The Rating System sets no entryway-system length requirement.1

FAQ

Does an out-of-scope base-building HVAC system waive ventilation compliance?

No. The July 31 addendum requires ASHRAE 62.1-2022 compliance for all project spaces regardless of HVAC scope.2

Is a 10-foot entry mat required by this text?

The ID+C v5 Rating System requires permanent entryway systems but explicitly sets no length requirement.1

Sources

This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.

  1. LEED v5 ID+C Rating SystemJuly 2026 · EQp2; printed pp. 88-89, PDF pp. 93-94; scorecard printed pp. 1-2, PDF pp. 6-7
  2. LEED v5 ID+C Addenda Table, cumulativeJuly 31, 2026; individual post dates identified in locator · PDF pp. 8-9, EQp2 ventilation, in-room air cleaning and all-project-space provisions; individual dates November 3, 2025 and July 31, 2026

Maintained by VERTIQ, LEED software for consultants.