EQp2 Fundamental Air Quality
Assess outdoor air, design compliant ventilation/filtration, and provide permanent entrance dirt-capture systems, with healthcare and residential additions where applicable.1
- Points
- Required
- Applies to
- BD+CID+C
Reviewed · Spot an error? Report it
Points
Required for NC and Core and Shell; no points. Entry systems and mechanical-air provisions are separate required components.1
Documents to prepare
Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.
- Outdoor-air-quality investigation
- Ventilation calculations and HVAC/filter/air-cleaner specifications
- Outdoor-air measurement device schedule
- Primary-entry permanent dirt-capture system drawings
- Healthcare ventilation or dwelling-unit exhaust/CO/combustion records where applicable
Worked example
Assume an applicable central system proposes MERV 13 filters and a permanent entrance mat system. MERV 13 reaches the named filter rating, but those two features do not establish the outdoor-air investigation, ventilation rates, airflow measurement, or subtype-specific requirements. No single aggregate compliance score is specified.1
Requirements
Investigate regional/local air under ASHRAE 62.1-2022 Sections 4.1-4.3 and meet Sections 5/6 using the permitted ventilation procedures. Where the ventilation rate or IAQ procedure is used, each central HVAC system serving regularly occupied spaces needs MERV 13, ePM1 50%, or tested in-room air-cleaning systems that are integrated into building controls and systems. Provide outdoor-air measurement for mechanical intakes over 1,000 cfm (472 L/s). Healthcare follows the specified ASHRAE 170-2021 provisions; dwelling units have detailed ventilation, exhaust, combustion, and CO-monitor requirements. Install permanent entrance systems at primary exterior entrances; no minimum length is specified.21
FAQ
Must the entrance system be a fixed ten-foot length?
This July 2026 prerequisite specifies no length requirement for the permanent entryway systems.1
Sources
This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.
- LEED v5 BD+C Rating SystemJuly 2026 · EQp2, printed pp. 150-152
- LEED v5 BD+C Addenda Table, cumulativeJuly 31, 2026 · EQp2: Fundamental Air Quality, Requirements and Requirements Explained, Addenda pp. 16-17
Maintained by VERTIQ, LEED software for consultants.