EQp1 Construction Management

Implement construction and preoccupancy practices that control contaminants and protect workers and future occupants.1

Points
Required
Applies to
ID+CBD+C

Reviewed · Spot an error? Report it

Points

Required prerequisite; no points. The practices must be implemented, not only listed in a plan.1

Documents to prepare

Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.

  • Preparation: Construction-management plan and responsibilities
  • Preparation: Dated implementation photographs and inspection records
  • Preparation: Filter replacement and testing/balancing records
  • Preparation: LEED v5 Construction Management Implementation Checklist and affirmation at completion of construction

Worked example

Assume a project identifies all seven practice groups and documents implementation for each. A designated smoking area 30 ft from the building exceeds the 25-ft separation by 5 ft. That single check does not establish the other construction-management requirements.1

Requirements

Address construction smoking, extreme-heat protection, HVAC protection, source control, pathway interruption, housekeeping and scheduling. Designated construction smoking areas must be at least 25 ft from the building, with no-smoking signage.1

Protect absorptive materials from moisture. Avoid running permanent HVAC equipment where possible; if used, maintain filtration. Replace filtration media after construction and before occupancy, and complete testing and balancing with new filters. Isolate contaminating work, control dust, clean with suitable methods and coordinate work around occupied areas.1

FAQ

Can a plan alone establish compliance?

The requirement is to develop and implement the practices.1

When must filters be replaced?

After construction is complete and before occupancy; testing and balancing must be completed with new filtration.1

Sources

This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.

  1. LEED v5 ID+C Rating SystemJuly 2026 · EQp1; printed pp. 86-87, PDF pp. 91-92; scorecard printed pp. 1-2, PDF pp. 6-7