EQp1 Construction Management
Implement construction and preoccupancy practices that protect workers, air systems, materials, and occupied areas.1
- Points
- Required
- Applies to
- BD+CID+C
Reviewed · Spot an error? Report it
Points
Required for NC and Core and Shell; no points.1
Documents to prepare
Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.
- Construction environmental/indoor-air-quality management plan
- Worker heat-protection and construction smoking/signage plan
- Material-protection and work-zone isolation records/photos
- Filter replacement record and testing/balancing report
- Construction sequencing and occupied-renovation coordination plan
- LEED v5 Construction Management Implementation Checklist and affirmation at completion of construction
Worked example
Assume 10 permanent HVAC filters were used during construction. Replacing only 9 leaves 1 unchanged, so 9/10 = 90% replacement does not meet the requirement to replace all filtration media before occupancy. Other construction-management obligations still apply.1
Requirements
Address construction smoking restrictions and signage, extreme-heat protection, HVAC contamination prevention, source control, pathway interruption, housekeeping, and sequencing. Protect absorptive materials from moisture, isolate contaminating work, and use appropriate dust-control methods. Replace all HVAC filtration after construction and before occupancy, and confirm testing/balancing with new filtration. For renovations coordinate work to limit disruption to occupied areas. The achievement table and scorecard apply the prerequisite to both NC and Core and Shell despite the section's abbreviated header.1
FAQ
Can permanent HVAC equipment run during construction?
Avoid it where possible; if it is used, keep contaminants out and maintain proper filtration, then replace all media before occupancy as required.1
Sources
This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.