EQc5 Air Quality Testing and Monitoring
Use preoccupancy testing and/or continuous indoor monitoring for up to 4 points.1
Reviewed · Spot an error? Report it
Points
Preoccupancy particulate/inorganic testing earns 1 point and VOC testing earns 1. Continuous monitoring earns 2; the options can be combined to a maximum of 4.12
Documents to prepare
Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.
- Preparation: Measurement-location plan and representative-location rationale
- Preparation: Accredited test reports, instrument specifications and corrective-action records
- Preparation: Continuous-monitor specifications and five-parameter location schedule
- Preparation: Substantial completion record showing construction finished before testing
Worked example
Assume the total occupied area is 12,000 ft2. Table 1 requires two measurements. If both testing paths meet every applicable limit and method requirement, they earn 2 points. A separate compliant continuous-monitoring option adds 2, for 4 total; merely placing two monitors does not prove the testing paths.1
Requirements
Conduct preoccupancy testing after construction under normal occupied ventilation conditions; Retail may test within 14 days of occupancy. Use the occupied-area measurement schedule and representative locations, the permitted test methods and instrument criteria, and all applicable contaminant limits.12
The particulate/inorganic path measures for four hours, using peak CO and average ozone/particulate concentrations. The VOC path includes TVOC screening plus all listed individual VOCs with ISO/IEC 17025-accredited laboratory methods; TVOC above 500 micrograms/m3 triggers investigation and correction/retesting as necessary.1
Continuous monitoring covers CO2, PM2.5, TVOC, temperature and relative humidity. Use building-grade or better monitors 3-6 ft above the floor. The July addendum assigns this option 2 points and the credit 4 points total.12
FAQ
Sources
This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.
- LEED v5 ID+C Rating SystemJuly 2026 · EQc5; printed pp. 103-106, PDF pp. 108-111; scorecard printed pp. 1-2, PDF pp. 6-7
- LEED v5 ID+C Addenda Table, cumulativeJuly 31, 2026; individual post dates identified in locator · PDF pp. 9-10, EQc5 Requirements measurement locations and Option 2 points, July 31, 2026
Maintained by VERTIQ, LEED software for consultants.