EQc5 Air Quality Testing and Monitoring

Use preoccupancy testing and/or continuous indoor monitoring for up to 4 points.1

Points
See below
Applies to
ID+CBD+C

Reviewed · Spot an error? Report it

Points

Preoccupancy particulate/inorganic testing earns 1 point and VOC testing earns 1. Continuous monitoring earns 2; the options can be combined to a maximum of 4.12

Documents to prepare

Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.

  • Preparation: Measurement-location plan and representative-location rationale
  • Preparation: Accredited test reports, instrument specifications and corrective-action records
  • Preparation: Continuous-monitor specifications and five-parameter location schedule
  • Preparation: Substantial completion record showing construction finished before testing

Worked example

Assume the total occupied area is 12,000 ft2. Table 1 requires two measurements. If both testing paths meet every applicable limit and method requirement, they earn 2 points. A separate compliant continuous-monitoring option adds 2, for 4 total; merely placing two monitors does not prove the testing paths.1

Requirements

Conduct preoccupancy testing after construction under normal occupied ventilation conditions; Retail may test within 14 days of occupancy. Use the occupied-area measurement schedule and representative locations, the permitted test methods and instrument criteria, and all applicable contaminant limits.12

The particulate/inorganic path measures for four hours, using peak CO and average ozone/particulate concentrations. The VOC path includes TVOC screening plus all listed individual VOCs with ISO/IEC 17025-accredited laboratory methods; TVOC above 500 micrograms/m3 triggers investigation and correction/retesting as necessary.1

Continuous monitoring covers CO2, PM2.5, TVOC, temperature and relative humidity. Use building-grade or better monitors 3-6 ft above the floor. The July addendum assigns this option 2 points and the credit 4 points total.12

FAQ

Is the TVOC screening value the only VOC requirement?

No. The path also requires testing every listed individual VOC and meeting its applicable limit.1

Does continuous monitoring earn only one point?

The July 31 correction and July Rating System assign it 2 points.12

Sources

This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.

  1. LEED v5 ID+C Rating SystemJuly 2026 · EQc5; printed pp. 103-106, PDF pp. 108-111; scorecard printed pp. 1-2, PDF pp. 6-7
  2. LEED v5 ID+C Addenda Table, cumulativeJuly 31, 2026; individual post dates identified in locator · PDF pp. 9-10, EQc5 Requirements measurement locations and Option 2 points, July 31, 2026

Maintained by VERTIQ, LEED software for consultants.