EQc5 Air Quality Testing and Monitoring

For NC, test air quality under the required preoccupancy conditions and/or provide continuous building-grade indoor-air monitoring.1

Points
See below
Applies to
BD+CID+C

Reviewed · Spot an error? Report it

Points

NC only, maximum 2 points. Preoccupancy particulate/inorganic testing 1 and VOC testing 1 can be combined; continuous monitoring earns 1 within the cap. The scorecard provides no C&S points for this credit.1

Documents to prepare

Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.

  • Preoccupancy air-testing plan with occupied area, sample locations, and ventilation conditions
  • Accredited laboratory and direct-reading test reports with method/device evidence
  • VOC investigation, correction, and retest records where applicable
  • Continuous-monitor parameter, grade, and mounting-height specifications for Option 2
  • Substantial-completion document showing construction finished before air testing

Worked example

Assume a proposed continuous-monitor specification measures CO2, PM2.5, TVOC, and temperature but omits relative humidity. It covers 4 of the 5 named parameters, so it does not meet that option. Adding humidity still requires the specified device grade and placement.1

Requirements

Preoccupancy testing occurs after construction and before occupancy under normal ventilation conditions; retail has the stated 14-day allowance. Use representative locations, the occupied-floor-area measurement table, permitted test methods, and pollutant limits. The particulate/inorganic and VOC paths have separate requirements; VOC testing includes accredited laboratory methods, TVOC screening, investigation, and correction/retesting as applicable. Continuous monitoring covers CO2, PM2.5, TVOC, temperature, and relative humidity using building-grade or better devices at the stated height.1

FAQ

Do continuous monitors replace every requirement of the preoccupancy test path?

Continuous monitoring is a separate 1-point option. It does not by itself establish either preoccupancy testing path.1

Sources

This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.

  1. LEED v5 BD+C Rating SystemJuly 2026 · EQc5, printed pp. 167-170