EQc1 Enhanced Air Quality

Exceed the air-quality prerequisite through increased ventilation, enhanced IAQ design or qualifying base-building ventilation verification.1

Points
Up to 2
Applies to
ID+CBD+C

Reviewed · Spot an error? Report it

Points

Maximum 2 points. Option 1 is 1-2 points; Option 2 or Option 3 is 1 point. The achievement table presents these options as alternatives.1

Documents to prepare

Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.

  • Preparation: Space-by-space minimum and proposed breathing-zone ventilation calculation
  • Preparation: Enhanced IAQP verification if selected
  • Preparation: Base-building AHU measurement report for eligible Option 3 projects

Worked example

Assume the Option 1 prerequisite breathing-zone rate is 1,000 cfm and the design provides 1,300 cfm to the required 95% of regularly occupied spaces. Increase = (1,300 - 1,000) / 1,000 x 100 = 30%, reaching 2 points if all applicable conditions are met.1

Requirements

Option 1 increases breathing-zone outdoor air at least 15% for 1 point or 30% for 2 points, serving 95% of regularly occupied spaces. Projects using the ventilation-rate procedure may use Option 1 or Option 2; those using IAQP use Option 2.1

Option 2 designs and verifies the additional IAQP limits: PM2.5 10 micrograms/m3, formaldehyde 20 micrograms/m3 and ozone 10 ppb, alongside the referenced ASHRAE compounds. Option 3 is for improvements to previously occupied spaces, not initial build-out: measure outdoor air from each serving base-building AHU under worst-case conditions and verify results within 10% of reported rates.1

FAQ

Can initial build-out use Option 3?

No. It is limited to tenant improvements in a previously occupied space.1

Can I add all three option points?

The Rating System shows OR between the options, with a 2-point maximum.1

Sources

This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.

  1. LEED v5 ID+C Rating SystemJuly 2026 · EQc1; printed pp. 91-92, PDF pp. 96-97; scorecard printed pp. 1-2, PDF pp. 6-7