EAp4 Energy Metering and Reporting

Provide the required tenant energy measurement and a five-year reporting commitment when the listed project-scope triggers apply.1

Points
Required
Applies to
ID+CBD+C

Reviewed · Spot an error? Report it

Points

Required prerequisite; no points. Determine applicability from the actual project scope before selecting meter specifications.1

Documents to prepare

Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.

  • Preparation: Project-size and service/scope applicability assessment
  • Preparation: Meter diagrams, recording intervals and energy-source schedule
  • Preparation: Annual data-reporting commitment

Worked example

Assume a 20,000-ft2 initial fit-out installs new on-site PV. It exceeds 10,000 ft2, triggering the stated larger-space monitoring provisions and 15-minute renewable-generation measurement. Fifteen-minute intervals give 4 readings per hour or 96 per day; the separate reporting commitment still applies.1

Requirements

Scope triggers include initial fit-out of at least 10,000 ft2, qualifying electrical-distribution alterations, new directly supplied tenant energy service and new on-site renewable energy. Apply the specified ASHRAE 90.1 monitoring rules and registration-date standard versions to covered initial fit-outs.1

The detailed provisions require at least monthly total-use measurement for the applicable smaller fit-out or new-service/alteration situations. New on-site renewables have interval requirements according to project size. Report 12 consecutive months of monthly tenant-metered energy-source data and renewable generation at least annually, plus peak demand if available, for five years or until ownership or lessee changes.1

FAQ

Does every tenant alteration have identical metering obligations?

No. The prerequisite identifies scope triggers and different recording provisions.1

Does the reporting commitment end automatically after one year?

It continues for five years or until the stated ownership/lessee change.1

Sources

This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.

  1. LEED v5 ID+C Rating SystemJuly 2026 · EAp4; printed pp. 38-39, PDF pp. 43-44; scorecard printed pp. 1-2, PDF pp. 6-7

Maintained by VERTIQ, LEED software for consultants.