EAp2 Minimum Energy Efficiency
Meet the selected ASHRAE 90.1 energy-efficiency standard for the interior project scope, using the version required by registration date.1
- Points
- Required
- Applies to
- ID+CBD+C
Reviewed · Spot an error? Report it
Points
Required prerequisite; no points.1
Documents to prepare
Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.
- Preparation: Registration-date and scope record
- Preparation: Applicable ASHRAE compliance documentation or approved equivalent
- Preparation: Prescriptive ASHRAE forms or system-by-system COMcheck report, if selected
- Preparation: Mandatory-measures compliance plus, for simulation routes, model input-output reports, end-use energy and demand results and the calculator or performance compliance form
- Preparation: District energy system documentation, including the energy source, if the project is served by one
Worked example
Assume a project registers on January 2, 2028. It is after the January 1 change date and must use Option 2, ASHRAE 90.1-2022. Choosing the 2019 option because it was acceptable during design would not satisfy this registration-date rule.1
Requirements
Projects registered before January 1, 2028 may use ASHRAE 90.1-2019 or 90.1-2022. Projects registered on or after that date must use the 2022 option. For Option 2, use an applicable Section 4.2 compliance path or an approved equivalent standard for elements in project scope.1
Appendix G users may apply the specified future-source-energy metric in place of cost, with the published building performance factors and permitted alteration adjustments. The 2022 option also allows site or source energy documented under Informative Appendix I. Do not substitute credit points for prerequisite compliance.1
For the prescriptive method, the July addendum identifies ASHRAE 90.1 compliance forms or a COMcheck report confirming a system-by-system approach.2
FAQ
Can a project registered in 2027 choose 2022?
Yes. Projects registered before January 1, 2028 may choose either option.1
Is a future-source-energy factor of 2.0 universal?
The text uses 2.0 for the U.S. and permits a lower applicable national-average value outside the U.S.; document the selected basis.1
Sources
This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.
- LEED v5 ID+C Rating SystemJuly 2026 · EAp2; printed pp. 33-35, PDF pp. 38-40; scorecard printed pp. 1-2, PDF pp. 6-7
- LEED v5 ID+C Addenda Table, cumulativeJuly 31, 2026; individual post dates identified in locator · PDF p. 4, EAp2 Documentation, All Options, Prescriptive Method; July 31, 2026
Maintained by VERTIQ, LEED software for consultants.