EAc1 Electrification

Electrify tenant and relevant base-building systems through the credit's whole-building, end-use, limited-scope or documented-base-building route.1

Points
See below
Applies to
ID+CBD+C

Reviewed · Spot an error? Report it

Points

Option 1 earns 5 points; Option 2 is up to 5; limited-scope Option 3 is 1-3; Option 4 is 1-5 using Table 2. Platinum requires no new on-site combustion equipment in the project scope.1

Documents to prepare

Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.

  • Preparation: Tenant and relevant base-building equipment/fuel schedule
  • Preparation: Rated-condition or annual modeled weighted-COP calculation
  • Preparation: Base-building credit evidence and tenant system compliance if using Option 4
  • Preparation: Emergency support and on-site generation list with fuel, capacity, use and estimated annual run-time
  • Preparation: Sequence of operations and load evidence for operation without combustion above 20 F (-6.5 C) if using Option 2

Worked example

Assume an initial-build-out project meets Option 1 with no on-site combustion except emergency support and a valid combined weighted COP of 2.0. The COP exceeds 1.8 by 0.2, so that condition is satisfied. With the complete eligible system scope and other requirements, the option earns 5 points.1

Requirements

Option 1 eliminates on-site combustion except emergency support systems, with combined space/service-water-heating COP of at least 1.8 for initial build-out or 1.2 for alterations, subject to listed exclusions. Option 2 permits specified low-temperature combustion, defined as outdoor dry-bulb below 20 F, and awards space-heating, water-heating and cooking/process path points.1

Option 3 installs no new combustion equipment in scope and applies its heating-efficiency criteria, with points tied to the minimum scope of work. Option 4 combines documented qualifying base-building performance and compliant tenant system types according to Table 2. The options are alternatives, capped at 5 points.1

For Options 1 and 2, the July addendum limits electrification requirements to the base-building site boundary and states that district energy delivered to that building is not subject to those electrification requirements. Do not apply a district-plant combustion ban from another version.2

FAQ

Does Option 1 permit ordinary fossil-fuel backup just because it is rarely used?

Its stated combustion exception is for emergency support systems. Option 2 has its separate low-temperature rules.1

Must delivered district energy meet Options 1 and 2 electrification conditions at the district plant?

The July addendum says these requirements apply only to the base-building site boundary and excludes delivered district energy.2

Sources

This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.

  1. LEED v5 ID+C Rating SystemJuly 2026 · EAc1; printed pp. 42-46, PDF pp. 47-51; scorecard printed pp. 1-2, PDF pp. 6-7; Appendix I LEED Platinum Requirements, printed p. 110 / PDF p. 115