Prerequisite Construction and Demolition Waste Management Planning
Plan diversion for at least five material categories and report final disposal and diversion.1
- Points
- Required
- Applies to
- ID+CBD+C
- VERTIQ reference ID
- MRp2
Reviewed · Spot an error? Report it
Points
Required prerequisite, with no points.1
Documents to prepare
Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.
- Preparation checklist: Dated waste-management plan with five targets, destinations and handling strategy.
- Preparation checklist: Final stream report, tickets and destination/recovery evidence.
Worked example
Assume the plan targets concrete, metal, wood, cardboard and gypsum. The five-category count is met. If 100 tonnes is generated and 60 diverted, the final report would show 60% diversion; the prerequisite still needs the implemented plan and complete major-stream report.1
Requirements
Develop and implement a plan identifying at least five structural/nonstructural materials targeted for diversion and their approximate share of project waste. State separation or commingling, destinations and recovery-facility processing. Provide a final report for major waste streams and their disposal/diversion rates.1
Count alternative daily cover as disposal, not diversion. Land-clearing debris does not contribute as C&D waste.1
FAQ
Does a five-category plan automatically earn the waste credit?
No. The prerequisite planning requirements are separate from the credit diversion or waste-generation thresholds.1
Sources
This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.
- LEED v4 for Interior Design and ConstructionUpdated July 25, 2019 · Construction and Demolition Waste Management Planning; printed and PDF pp. 40
Maintained by VERTIQ, LEED software for consultants.