Prerequisite Construction and Demolition Waste Management Planning

Plan construction-waste diversion and provide a final report of actual waste outcomes.1

Points
Required
Applies to
BD+CID+C
VERTIQ reference ID
MRp2

Reviewed · Spot an error? Report it

Points

Required prerequisite; no points. The planning requirement is separate from earning Construction and Demolition Waste Management diversion points.1

Documents to prepare

Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.

  • Construction waste management plan
  • Target-material and destination schedule
  • Recycler/hauler agreements
  • Final waste/diversion report

Worked example

Assume five targeted materials account for estimated shares of 25%, 20%, 15%, 10% and 5% of waste. Together they represent 75%. That is a planning estimate, not a measured 75% diversion achievement.1

Requirements

Identify at least five structural/nonstructural materials targeted for diversion and estimate their share of overall waste. Describe separation/commingling, destinations and processing. Provide the final major-stream report with disposal/diversion rates. Alternative daily cover is waste; land-clearing debris cannot contribute to construction-waste diversion.1

FAQ

Does naming five target materials establish actual diversion points?

No. The prerequisite plan and final outcomes are distinct from the credit's measured diversion and stream thresholds.1

Sources

This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.