Credit Bicycle Facilities

Provide an eligible bicycle connection and storage sized for the ID+C adaptation.1

Points
1 point
Applies to
ID+CBD+C
Other versions
v4.1
VERTIQ reference ID
LTc4

Reviewed · Spot an error? Report it

Points

1 point for the applicable complete network, storage and support requirements.1

Documents to prepare

Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.

  • Preparation checklist: Bicycle-network map and destination distances.
  • Preparation checklist: Visitor/occupant count, storage layout and shower evidence, or Retail program documentation.

Worked example

Assume Commercial Interiors has 200 peak visitors and 80 regular occupants. Short-term demand is 200 x 2.5% = 5 spaces; long-term demand is 80 x 5% = 4, and one shower is needed. These counts still require the qualifying network, locations and non-double-counted capacity.1

Requirements

The entry or bicycle storage must be within 200 yards (180 meters) of a network reaching ten diverse uses or qualifying rapid transit, rail or ferry; destinations must be within 3 miles (4,800 meters) by bicycle. Eligible planned lanes must be funded by occupancy certification and complete within one year. Where the historic urban context in Europe prevents the required bike path width, the published compensating measures may be used on routes to a qualifying network, and those routes must be identified in the documentation.12

Commercial Interiors and Hospitality need short-term spaces for 2.5% of peak visitors, minimum two, and long-term spaces for 5% of regular occupants, minimum two. Provide a shower/changing facility for the first 100 regular occupants and an additional one per 150 thereafter. Storage must be within 100 feet (30 meters) of the applicable entrance and cannot be double allocated.1

Retail uses two short-term spaces per 5,000 square feet, minimum two, plus 5% long-term storage, minimum two. Provide an employee bicycle-maintenance program or accessible route assistance for employees and customers.1

FAQ

Can another tenant fully claim the same racks?

No. Capacity fully allocated to nonproject occupants cannot also serve this project.1

Sources

This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.

  1. LEED v4 for Interior Design and ConstructionUpdated July 25, 2019 · Bicycle Facilities; printed and PDF pp. 13-14
  2. LEED v4 Reference Guide for Interior Design and Construction AddendaCumulative through February 20, 2026 · PDF p.8, April 6, 2018 Europe ACP: Bike Path Width

Maintained by VERTIQ, LEED software for consultants.