Prerequisite Building-Level Water Metering
Meter total potable water use for the building and associated grounds and summarize it over time.1
- Points
- Required
- Applies to
- BD+C
- Other versions
- v4.1
- VERTIQ reference ID
- WEp3
Reviewed · Spot an error? Report it
Points
Required prerequisite; no points.1
Documents to prepare
Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.
- Water service and meter diagram
- Meter specifications and reading protocol
- Monthly/annual reporting template
- Data sharing confirmation
- Meter declaration
Worked example
Assume monthly readings total 12,000 m3 across all project potable supply meters. The annual summary is the sum of those 12 monthly totals; an unmetered irrigation branch must be addressed before that total represents the whole project.1
Requirements
Install permanent meters covering total project potable use. Compile monthly and annual summaries; manual or automated readings are allowed. Commit to the source's five-year USGBC data-sharing period beginning at certification acceptance or typical occupancy, whichever is first, subject to the stated ownership/lessee condition.1
FAQ
Must every reading be automated?
No. Manual readings are allowed if the permanent-meter coverage and required summaries are provided.1
Sources
This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.
- LEED v4 BD+C Rating SystemUpdated July 25, 2019 · Building-Level Water Metering prerequisite, printed/PDF pp. 54
Maintained by VERTIQ, LEED software for consultants.