Prerequisite Building-Level Water Metering
Meter total potable-water use and retain a five-year data-sharing commitment.1
- Points
- Required
- Applies to
- BD+C
- Other versions
- v4
- VERTIQ reference ID
- WEp3
Reviewed · Spot an error? Report it
Points
Required prerequisite; no points.1
Documents to prepare
Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.
- Water service and meter diagram
- Meter declaration with permanent meter specifications
- Monthly/annual reporting plan
- Owner's USGBC data-sharing commitment
Worked example
Assume the building and grounds are supplied by two potable services reading 900 m3 and 100 m3 in a month. The whole-project summary is 1,000 m3, provided the meters cover all potable supply and no service is omitted. Repeat into monthly and annual summaries.1
Requirements
Install permanent meters covering the building and associated grounds. Compile monthly and annual summaries; manual readings are permitted. Share resulting whole-project usage with USGBC for five years from certification acceptance or typical occupancy, whichever comes first. The commitment carries for five years or until ownership/lessee changes.1
FAQ
Must readings be automated?
No. The prerequisite permits manual or automated readings, with monthly and annual summaries.1
Sources
This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.