Prerequisite Outdoor Water Use Reduction

Eliminate permanent irrigation after establishment or reduce peak-month landscape demand by at least 30%.1

Points
Required
Applies to
BD+C
Other versions
v4.1
VERTIQ reference ID
WEp1

Reviewed · Spot an error? Report it

Points

Required prerequisite; no points.1

Documents to prepare

Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.

  • Landscape planting and area schedule
  • Water budget calculation from the WaterSense tool, or the non-U.S. calculator outside the U.S.
  • Irrigation design and controller specifications
  • Establishment-period maintenance plan

Worked example

Assume baseline peak-month landscape demand is 100 m3 and efficient planting/irrigation reduces it to 65 m3. Reduction = (100 - 65) / 100 x 100 = 35%, exceeding the 30% efficiency requirement.1

Requirements

Exclude nonvegetated surfaces from landscape calculations. Option 1 permits up to two years of establishment irrigation, after which permanent irrigation is unnecessary. Option 2 requires 30% reduction through plant selection and irrigation efficiency calculated with the WaterSense Water Budget Tool, or with the non-U.S. water budget calculator for projects outside the U.S.; it is not met solely by substituting a water source.12

FAQ

Can captured rainwater alone meet Option 2's efficiency reduction?

The prerequisite specifies plant selection and irrigation-system efficiency for the required 30% reduction.1

Sources

This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.

  1. LEED v4 BD+C Rating SystemUpdated July 25, 2019 · Outdoor Water Use Reduction prerequisite, printed/PDF pp. 50
  2. LEED v4 BD+C Reference Guide AddendaCumulative table, February 20, 2026 · WE Prerequisite Outdoor Water Use Reduction, Step-By-Step Guidance, Step 1, post date 1/1/2015, addenda PDF p. 27

Maintained by VERTIQ, LEED software for consultants.