Prerequisite Outdoor Water Use Reduction
Use a landscape that needs no permanent irrigation after establishment or reduce landscape water demand by at least 30%.1
- Points
- Required
- Applies to
- BD+C
- Other versions
- v4
- VERTIQ reference ID
- WEp1
Reviewed · Spot an error? Report it
Points
Required prerequisite; no points.1
Documents to prepare
Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.
- Landscape planting and irrigation plans
- EPA WaterSense water-budget calculation
- No-permanent-irrigation narrative and establishment plan where selected
Worked example
Assume peak-month baseline landscape demand is 100 m3 and the calculated design demand after plant and irrigation choices is 68 m3. Reduction = 32%, exceeding 30%. An alternative-water supply alone does not demonstrate the prerequisite's specified efficiency reduction.1
Requirements
The no-irrigation route permits an establishment period of at most two years. The reduction route uses the peak watering month and EPA WaterSense Water Budget Tool, with savings from plant selection and irrigation efficiency. Exclude nonvegetated surfaces. Vegetated athletic fields/playgrounds and food gardens can be included or excluded at the team's discretion.1
FAQ
Can a permanent irrigation system be described as establishment-only?
Only the no-irrigation route's temporary establishment period is allowed; document how permanent irrigation is avoided after at most two years.1
Sources
This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.
- LEED v4.1 BD+C Rating SystemFebruary 2025 download; cover dated July 28, 2023 · Printed and PDF pp. 52
Maintained by VERTIQ, LEED software for consultants.