Prerequisite Environmental Site Assessment

Assess contamination and remediate where required for Schools and Healthcare projects.1

Points
Required
Applies to
BD+C
Other versions
v4.1
VERTIQ reference ID
SSp2

Reviewed · Spot an error? Report it

Points

Required for Schools and Healthcare; no points. This is not a prerequisite for every BD+C adaptation.1

Documents to prepare

Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.

  • Phase I environmental site assessment
  • Phase II sampling report where indicated
  • Regulatory cleanup criteria and remediation closure

Worked example

Assume Phase I identifies two suspect areas. Phase II and the remediation decision must address those findings; clearing one of two suspect areas does not establish that the whole site satisfies the prerequisite.1

Requirements

Conduct Phase I environmental assessment using the cited ASTM E1527-05 or local equivalent. If contamination is suspected, conduct Phase II using ASTM E1903-11 or local equivalent. Remediate contamination to the most stringent applicable residential unrestricted-use standards.1

FAQ

Does a completed Phase I automatically establish compliance?

No. Suspected contamination triggers further assessment, and actual contamination requires compliant remediation.1

Sources

This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.