Prerequisite Environmental Site Assessment
Schools and Healthcare must assess site contamination and remediate where required.1
- Points
- Required
- Applies to
- BD+C
- Other versions
- v4
- VERTIQ reference ID
- SSp2
Reviewed · Spot an error? Report it
Points
Required prerequisite for Schools and Healthcare; no points.1
Documents to prepare
Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.
- Phase I environmental site assessment
- Phase II testing report where triggered
- Description of contamination and remediation, with verification that the site meets residential use standards, where contamination is confirmed
Worked example
Assume Phase I identifies two areas of potential contamination. Both must be addressed in the Phase II investigation scope as appropriate; merely completing one Phase I report does not establish that the site is clean.1
Requirements
Schools and Healthcare only. Complete a Phase I assessment under ASTM E1527-13 or a local equivalent. If contamination is suspected, carry out Phase II under ASTM E1903-11 or local equivalent. A contaminated site must meet the most stringent applicable residential/unrestricted remediation standard. The cited editions are the LEED document's references, not a statement that these are the newest ASTM editions.1
FAQ
Is this prerequisite required for every NC project?
The cited prerequisite applies specifically to Schools and Healthcare.1
Sources
This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.
- LEED v4.1 BD+C Rating SystemFebruary 2025 download; cover dated July 28, 2023 · Printed and PDF pp. 33
Maintained by VERTIQ, LEED software for consultants.