Prerequisite Construction Activity Pollution Prevention
Implement the applicable erosion and sediment controls, or document why the permitted no-disturbance exception needs no ESC plan.12
- Points
- Required
- Applies to
- BD+C
- Other versions
- v4.1
- VERTIQ reference ID
- SSp1
Reviewed · Spot an error? Report it
Points
Required prerequisite; no points.1
Documents to prepare
Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.
- Erosion and sedimentation control plan, or a narrative explaining why no plan is necessary for zero-lot-line or no-exterior-disturbance projects
- Construction inspection logs and photographs
- Applicable permit/local-requirement comparison
Worked example
Assume a small project disturbs only 0.2 hectares. Its area does not remove the prerequisite: the plan still covers all of its construction activities, including runoff, sediment and dust controls.1
Requirements
Create and implement an erosion and sedimentation control plan meeting the 2012 EPA Construction General Permit or local equivalent, whichever is more stringent. The permit's erosion/sediment requirements apply regardless of project size. Describe the controls actually implemented.1
Zero-lot-line projects and projects causing no exterior site disturbance may instead provide a narrative explaining why no erosion and sedimentation control plan is necessary. Small site area alone does not establish this exception.2
FAQ
Sources
This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.
- LEED v4 BD+C Rating SystemUpdated July 25, 2019 · Construction Activity Pollution Prevention prerequisite, printed/PDF pp. 30
- LEED v4 BD+C Reference Guide AddendaCumulative table, February 20, 2026 · Construction Activity Pollution Prevention, printed/PDF p. 9, guide p. 141
Maintained by VERTIQ, LEED software for consultants.