Prerequisite Construction Activity Pollution Prevention
Implement an erosion and sediment-control plan for the project's construction activities.1
- Points
- Required
- Applies to
- BD+C
- Other versions
- v4
- VERTIQ reference ID
- SSp1
Reviewed · Spot an error? Report it
Points
Required prerequisite; no points.1
Documents to prepare
Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.
- Erosion and sediment-control plan
- Construction inspection logs and site photographs
- Applicable local permit/CGP compliance matrix
Worked example
Assume a 0.3-hectare project falls below a local permit-size trigger. The LEED prerequisite still requires a qualifying plan for its construction activities; the small site area does not remove the requirement.1
Requirements
Apply the 2017 EPA Construction General Permit erosion/sediment requirements or a more stringent local equivalent. The LEED requirement applies regardless of project size. Describe the controls actually implemented and retain records showing that the construction team followed the plan.1
FAQ
Can a small construction site skip the plan?
No. The prerequisite applies its CGP requirement regardless of size.1
Sources
This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.
- LEED v4.1 BD+C Rating SystemFebruary 2025 download; cover dated July 28, 2023 · Printed and PDF pp. 32