Prerequisite Integrative Project Planning and Design

Establish an integrated planning process for Healthcare with the owner and required disciplines.1

Points
Required
Applies to
BD+C
Other versions
v4.1
VERTIQ reference ID
IPp1

Reviewed · Spot an error? Report it

Points

Required for Healthcare; no points.1

Documents to prepare

Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.

  • Healthcare OPR and health mission statement
  • Preliminary LEED action plan
  • Integrated team roster
  • Dated charrette agenda, attendance and decisions

Worked example

Assume a four-hour charrette includes the owner and four eligible professional disciplines. That satisfies the stated duration and minimum team composition only if the health mission, early LEED planning and documented decisions also meet the prerequisite.1

Requirements

Create an OPR with a health mission addressing economic, environmental and social goals. Hold an early preliminary LEED meeting, set a certification/action plan and responsibilities, assemble the specified integrated team with at least four listed disciplines plus the owner/representative, and conduct a minimum four-hour integrated design charrette.1

FAQ

Can the owner be counted as one of the four professional disciplines?

The source requires at least four listed professionals in addition to the owner or owner's representative.1

Sources

This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.

  1. LEED v4 BD+C Rating SystemUpdated July 25, 2019 · Integrative Project Planning and Design prerequisite, printed/PDF pp. 8

Maintained by VERTIQ, LEED software for consultants.