Prerequisite Integrative Project Planning and Design

Healthcare projects must establish an integrated team, health goals and an early design process.1

Points
Required
Applies to
BD+C
Other versions
v4
VERTIQ reference ID
IPp1

Reviewed · Spot an error? Report it

Points

Required for Healthcare; no points.1

Documents to prepare

Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.

  • Owner's Project Requirements with health mission
  • LEED action plan and responsibility matrix
  • Charrette agenda, attendance record and minutes

Worked example

Assume the owner attends with an architect, mechanical engineer, facility manager and infection-control representative. That gives four professional participants in addition to the owner. A documented four-hour charrette meets the stated duration, subject to its content and other process requirements.1

Requirements

Healthcare only. Incorporate a health mission statement in the Owner's Project Requirements. Conduct an early preliminary LEED meeting, select certification goals and responsible parties, and assemble at least four disciplines in addition to the owner or representative. Hold an integrated design charrette lasting at least four hours, preferably before schematic design.1

FAQ

Is a late LEED scorecard sufficient?

No. The prerequisite calls for a cross-discipline process beginning during programming and pre-design.1

Sources

This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.

  1. LEED v4.1 BD+C Rating SystemFebruary 2025 download; cover dated July 28, 2023 · Printed and PDF pp. 8