Prerequisite Building-Level Energy Metering
Measure all required building energy sources and commit to sharing consumption data.1
- Points
- Required
- Applies to
- BD+C
- Other versions
- v4.1
- VERTIQ reference ID
- EAp3
Reviewed · Spot an error? Report it
Points
Required prerequisite; no points.1
Documents to prepare
Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.
- Energy service and meter diagram
- Meter schedules/specifications
- Monthly energy reporting plan
- Data-sharing confirmation and meter declaration
Worked example
Assume electricity totals 100 MWh and gas is metered separately. Reporting only 100 MWh of electricity does not represent total building energy; preserve both sources and their explicit units in the project record.1
Requirements
Use permanent meters or aggregated submeters to represent total building energy, including all applicable fuels and purchased thermal energy. Track consumption at least monthly and provide the specified five-year USGBC sharing commitment. Core and Shell uses base-building coverage and its stated certification/occupancy start rule.1
FAQ
Can utility-owned meters be used?
Yes, if they provide the required building-level resource-use coverage.1
Sources
This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.