Prerequisite Storage and Collection of Recyclables
Provide accessible recycling collection and storage for the project and safely manage at least two of the three specified special-waste types.1
Reviewed · Spot an error? Report it
Points
Required prerequisite; 0 points.1
Documents to prepare
Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.
- Preparation checklist: Recycling location/access plan and accepted-material schedule coordinated with the building operator.
- Preparation checklist: Storage and collection arrangements for at least two specified special-waste types.
Worked example
Assume the tenant uses a building recycling room. Confirm the five ordinary recyclable groups are accepted, that occupants and haulers can access the service, and that safe collection exists for batteries and electronic waste. Those two special-waste streams meet the category count only if their collection, storage and disposal measures are documented.1
Requirements
Provide dedicated areas accessible to haulers and occupants for collection and storage of mixed paper, corrugated cardboard, glass, plastics and metals. The recycling area must serve the entire building.1
Provide safe collection, storage and disposal measures for at least two of batteries, mercury-containing lamps and electronic waste. Coordinate the tenant scope and base-building services rather than assuming a general waste room covers each required material.1
FAQ
Can mixed recycling collection satisfy the ordinary material list?
The requirement allows collection and storage of the listed recyclable materials; document that all five groups are accepted by the service.1
Are all three special-waste types required?
No. Safe measures are required for at least two of the three specified types.1
Sources
This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.
- LEED v4.1 Interior Design and Construction GuideNovember 2025 · Storage and Collection of Recyclables prerequisite, printed/PDF pp. 95-95; ID+C scorecard printed/PDF pp. 5-6
Maintained by VERTIQ, LEED software for consultants.