Credit Water Metering

Submeter at least two eligible water subsystems, with additional Healthcare metering.1

Points
1 point
Applies to
BD+C
Other versions
v4
VERTIQ reference ID
WEc4

Reviewed · Spot an error? Report it

Points

1 point.1

Documents to prepare

Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.

  • Water metering strategy narrative with each submeter's subsystem, location and model, plus a submeter diagram
  • Irrigation area and hot-water capacity schedule
  • Meter product data and subsystem-coverage calculations
  • Healthcare clinical-system meter schedule where applicable

Worked example

Assume irrigation metering serves 900 of 1,000 m2 irrigated area and hot-water metering covers 90 of 100 kW installed heating capacity. Both coverages are 90%, exceeding their 80% tests, so they can provide two eligible subsystems for a non-Healthcare project.1

Requirements

Eligible subsystems include irrigation, fixtures/fittings, domestic hot water, qualifying boilers, reclaimed water and other process uses. Apply the stated coverage basis: for example, 80% of irrigated area, fixture scope, hot-water capacity or daily process use as appropriate. Reclaimed water is metered regardless of flow rate and must distinguish any makeup supply. Healthcare additionally meters any five of the ten listed clinical and support systems.1

FAQ

Does the whole-building meter alone earn this credit?

No. The credit requires subsystem metering beyond the building-level prerequisite.1

Sources

This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.