Credit Design for Flexibility
Healthcare projects implement at least three listed strategies for future adaptation.1
- Points
- 1 point
- Applies to
- BD+C
- Other versions
- v4
- VERTIQ reference ID
- MRc8
Reviewed · Spot an error? Report it
Points
1 point.1
Documents to prepare
Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.
- Preparation suggestion: Healthcare departmental area program
- Preparation suggestion: Soft/shell/expansion and future-service diagrams
- Preparation suggestion: Demountable partition or modular casework calculation
- Preparation suggestion: Selected flexibility-strategy compliance narrative
Worked example
Assume a department has 10,000 m2 gross area. Providing 500 m2 of properly located soft space meets that strategy's 5% quantity, and a separate 500 m2 of eligible shell space meets its 5% quantity. Those are two strategies; at least one further listed strategy must fully comply.1
Requirements
Healthcare only. Select at least three of the defined strategies, such as interstitial utility space, adjacent programmed soft space, shell space, horizontal/vertical expansion, future structured parking, demountable partitions or modular casework. Meet each selected strategy's actual area, location, continuity or value criterion; a general statement that the building is flexible is insufficient.1
FAQ
Can one oversized strategy replace three strategies?
No. The credit requires at least three listed strategies with their individual conditions.1
Sources
This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.