Credit Design for Flexibility

Healthcare projects implement at least three listed strategies for future adaptation.1

Points
1 point
Applies to
BD+C
Other versions
v4
VERTIQ reference ID
MRc8

Reviewed · Spot an error? Report it

Points

1 point.1

Documents to prepare

Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.

  • Preparation suggestion: Healthcare departmental area program
  • Preparation suggestion: Soft/shell/expansion and future-service diagrams
  • Preparation suggestion: Demountable partition or modular casework calculation
  • Preparation suggestion: Selected flexibility-strategy compliance narrative

Worked example

Assume a department has 10,000 m2 gross area. Providing 500 m2 of properly located soft space meets that strategy's 5% quantity, and a separate 500 m2 of eligible shell space meets its 5% quantity. Those are two strategies; at least one further listed strategy must fully comply.1

Requirements

Healthcare only. Select at least three of the defined strategies, such as interstitial utility space, adjacent programmed soft space, shell space, horizontal/vertical expansion, future structured parking, demountable partitions or modular casework. Meet each selected strategy's actual area, location, continuity or value criterion; a general statement that the building is flexible is insufficient.1

FAQ

Can one oversized strategy replace three strategies?

No. The credit requires at least three listed strategies with their individual conditions.1

Sources

This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.