Credit Building Life-Cycle Impact Reduction
Use building reuse, whole-building life-cycle assessment, or a combination within a five-point total.1
Reviewed · Spot an error? Report it
Points
Option 1 up to 5 points; Option 2 up to 4 points; combined credit maximum 5, including Core and Shell.1
Documents to prepare
Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.
- Existing-condition and demolition drawings
- Retained structure/enclosure area takeoff
- Interior nonstructural reuse calculation where claimed
- Baseline and proposed whole-building LCA reports and model assumptions
Worked example
Assume the structural-reuse denominator is 10,000 m2 and qualifying retained area is 4,500 m2. Reuse = 4,500/10,000 x 100 = 45%, reaching the 3-point structural path. The area basis and qualifying retained elements must be documented; this is not a material-mass calculation.1
Requirements
Option 1 evaluates retained structure/enclosure by project area and retained interior nonstructural elements. Structural reuse at 15%, 30%, 45%, 60% and 75% earns 1 to 5 points; at least 30% interior nonstructural reuse earns 1 point. Applicable paths can combine, but the total credit remains capped at 5. Do not also count reused materials under Sourcing of Raw Materials when they contribute here.1
Option 2 evaluates the structure and enclosure over a consistent service life of at least 60 years. A completed LCA earns 1 point; reductions of at least 5% or 10% in three impact categories including GWP earn 2 or 3 points. The 4-point path requires reuse/salvage, at least 20% GWP reduction and 10% in two other categories. For reduction paths, no assessed category may increase more than 5%. Use comparable baseline/proposed models and the same tools and datasets.1
FAQ
Can Core and Shell claim six points?
The February 2025 Rating System states a five-point credit maximum for every listed BD+C adaptation, including Core and Shell.1
Is GWP the only LCA impact category needed?
No. Reduction paths require other categories and reporting of all listed categories, with the stated increase limit.1
Sources
This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.