Your Appendix G model comes back and the proposed building uses 40 percent less future source energy than the baseline. Path 1 of the EAc3 points table tops out at 30 percent for 10 points, so the credit looks maxed out. Under the assumptions in the worked example below, that same model earns 4.

The gap comes from what the percentage is measured against. In LEED v5 BD+C, EAc3 Enhanced Energy Efficiency does not score savings against the baseline building. It scores how far the proposed design lands below a performance index target, and that target already sits well under the baseline. This is a reference for how EAp2 Minimum Energy Efficiency and the EAc3 energy simulation option connect, and how to read the points table without overcounting.

What the credit is worth

  • EAp2 Minimum Energy Efficiency: required for New Construction and Core and Shell. No points.
  • EAc3 Enhanced Energy Efficiency, New Construction: 1 to 10 points. Platinum projects need 8.
  • EAc3 Enhanced Energy Efficiency, Core and Shell: 1 to 7 points. Platinum projects need 5.

EAc3 has two options, and they are alternatives. Option 1 is a prescriptive path built on ASHRAE 90.1-2022 Section 11 energy credits plus plug and process load measures. Option 2 is whole-building energy simulation using the ASHRAE 90.1 Normative Appendix G Performance Rating Method. This post covers Option 2, because that is where the points math surprises people.

EAp2 sets the standard edition for everything after it

EAp2 has two options. Option 1 is ASHRAE 90.1-2019 with addendum cr. Option 2 is ASHRAE 90.1-2022. Projects registering before January 1, 2028 may comply with either. Projects registering on or after that date must use 90.1-2022. In both cases the prerequisite accepts any applicable compliance path in Section 4.2 of the standard, so Appendix G is one route among several.

That edition choice does not stay inside the prerequisite. EAc3 Option 2 says to use the ASHRAE 90.1 version applied for EAp2. EAc2 Reduce Peak Thermal Loads ties its envelope requirements to the version referenced in EAp2 as well. Pick the edition once, early, and carry it through.

The metric is where EAp2 and EAc3 part ways. For EAp2 projects on Appendix G, the future source energy metric may be used in place of cost. On 90.1-2022, site energy or source energy documented with Informative Appendix I is also allowed. EAc3 Option 2 gives no such choice. Every reference to cost is replaced with future source energy. An EAp2 result documented on energy cost does not tell you the EAc3 number.

Three more provisions shape that number:

  • Electricity uses a site-to-source conversion factor of 2.0, based on future projections for the U.S. Projects outside the U.S. may use a lower national average where applicable.
  • ASHRAE 90.1 Table 4.2.1.1 Building Performance Factors (BPFs) are replaced with the LEED tables of BPFs derived for future source energy. For major building renovation areas, multiply the BPF by 1.05.
  • Plug and process load efficiency measures are modeled with the Section G2.5 Exceptional Calculation Method or approved calculations, and the PI and percentage improvement are calculated both with and without those savings.

Points are measured below PI_t

EAc3 Option 2 defines three indices:

  • PI_nre = PBP_nre / BBP
  • PI = PBP / BBP
  • PI_t = [BBUE + (BPF x BBRE)] / BBP

BBP is baseline building performance in future source energy. BBUE and BBRE are the baseline's unregulated and regulated future source energy. PBP_nre is proposed building performance without any credit for on-site renewable generation, and PBP includes it.

Points come from the percentage reduction below the target, on one of two paths:

  • Path 1, excluding on-site renewable contribution: 100% - PI_nre / PI_t
  • Path 2, including on-site renewable contribution: 100% - PI / PI_t

For New Construction, Path 1 starts at 3% for 1 point and climbs in 3-percentage-point steps to 30% for 10 points. Path 2 starts at 10% for 1 point and climbs in 10-percentage-point steps to 100% for 10 points. Points are awarded using either Path 1 or Path 2.

Two consequences follow. First, with a BPF below 1, PI_t is below 1.0, because the BPF discounts the regulated share of the baseline. A design that only matches PI_t already beats the baseline, and on the New Construction table it earns zero EAc3 points. Second, savings against baseline, 1 - PBP_nre / BBP, is not the number the table reads. Plugging it in overstates the score, sometimes by a lot.

A worked example

Assumptions (illustrative, not from any real project):

  • New Construction office in climate zone 4A, EAp2 Option 1 (90.1-2019), registered before 2028.
  • BPF = 0.55, the Office and 4A value in EAc3 New Construction Table 5 (90.1-2019 equivalent BPFs for future source energy).
  • BBP = 10,000 MMBtu of future source energy, split into BBRE 7,000 and BBUE 3,000.
  • PBP_nre = 6,000 MMBtu. That is 40 percent below the baseline.

The naive read: 40 percent savings is above the table's top row of 30 percent, so 10 points.

The correct read:

  • PI_t = (3,000 + 0.55 x 7,000) / 10,000 = 0.685
  • PI_nre = 6,000 / 10,000 = 0.600
  • 100% - 0.600 / 0.685 = 12.4%

12.4 percent clears the 12% row and misses 15%. 4 points, not 10.

Working backward shows how far the real thresholds sit from the naive ones. Platinum needs 8 points, which on Path 1 is 24% below PI_t. That means PI_nre at or under 0.76 x 0.685 = 0.521, roughly 48 percent below the baseline. Ten points needs 30% below PI_t, or PI_nre at or under 0.70 x 0.685 = 0.480, about 52 percent below the baseline.

The regulated and unregulated split moves the target

Keep the same 40 percent savings but change the assumed baseline split to BBRE 8,000 and BBUE 2,000. Now PI_t = (2,000 + 0.55 x 8,000) / 10,000 = 0.640, and 100% - 0.600 / 0.640 = 6.25%. That clears the 6% row: 2 points. Same savings against baseline, half the score.

The BPF discounts only regulated energy. The larger the regulated share of the baseline, the lower and tighter PI_t becomes. Two buildings that report identical percent savings can land on different rows of the same table.

Path 2 is a steeper table

Go back to the first split and add on-site PV that the model credits at 1,000 MMBtu of future source energy (assumed). PBP = 5,000, so PI = 0.500 and 100% - 0.500 / 0.685 = 27.0%. On Path 2 that clears 20% and misses 30%: 2 points. Path 1 on the same model still gives 4.

On the New Construction table, Path 2 thresholds rise 10 percentage points per point, so modest on-site generation can score lower there than the same design scores on Path 1. Calculate both and use the path that scores higher for the project.

Try your own numbers

LEED v5 BD+C New Construction, EAc3 Option 2. Example: office, climate zone 4A. Use the same future source energy unit throughout.

Proposed PI 0.6. EAc3 directs both ASHRAE editions to Table 5.

EAc3 Table 54 pointsPI target 0.68512.41% below target
If you use EAp2 Table 21 pointPI target 0.6223.54% below target
The BPF choice changes the points. Confirm with your reviewer.

Mistake: score the 40% baseline reduction as 10 points.

Build Appendix G models and calculate EAc3 points in VERTIQ

Core and Shell reads its own table

Core and Shell scores Option 2 on Table 8, which splits each path by standard edition.

  • 90.1-2019 (Case 1): Path 1 runs from 2% for 1 point to 20% for 7 points. Path 2 runs from 10% for 1 point to 70% for 7 points.
  • 90.1-2022 (Case 2): Path 1 gives 3 points at 0% below PI_t, then 3%, 6%, 9%, and 12% for 4 through 7 points. Path 2 gives 2 points at 0% and reaches 7 points at 65%.

If you look up the BPFs yourself, note a numbering slip: the Core and Shell Option 2 text says to use Tables 4 and 5, but the Core and Shell BPF tables are printed as Tables 9 (90.1-2019) and 10 (90.1-2022) in the July 2026 edition.

For a 90.1-2022 Core and Shell project, meeting the target is already worth 3 points on Path 1. Carry New Construction intuition into a Core and Shell model, or a 2019 expectation into a 2022 one, and the estimate will be wrong in one direction or the other.

What trips people up

  • Reading the points table with savings against the baseline. The table reads 100% - PI_nre / PI_t or 100% - PI / PI_t, a reduction below the target.
  • Reusing the EAp2 model unchanged. If EAp2 was documented on energy cost, EAc3 still needs future source energy with electricity at 2.0.
  • Mixing standard editions. EAc3 Option 2 uses the 90.1 version applied for EAp2, and the BPF table and points column have to match it.
  • Assuming New Construction and Core and Shell handle 90.1-2022 the same way. The New Construction Option 2 text sends both 90.1-2019 and 90.1-2022 projects to Table 5, which is titled for 90.1-2019. Core and Shell prints a separate 90.1-2022 table and a separate Case 2 points column. The difference is not small. For an office in climate zone 4A, Table 5 gives 0.55, while the 90.1-2022 future source energy BPF table in EAp2 (Table 2) gives 0.46. Rerun the worked example above with 0.46 and PI_t drops to 0.622, the result to 3.5 percent below it, and the score from 4 points to 1. Confirm which BPF table GBCI expects for a New Construction project on 90.1-2022 before you fix the target.
  • Treating on-site renewables as automatic upside. Path 2 points are 10 percentage points wide for New Construction and Core and Shell on 90.1-2019, and 13 percentage points wide for Core and Shell on 90.1-2022.
  • Skipping the 1.05 BPF multiplier for major building renovation areas.
  • Reporting plug and process savings only once. The PI and percentage improvement are required with and without them.

Source: LEED v5 BD+C Rating System, July 2026 Edition (USGBC resource page publication date August 1, 2026). EAp2 Minimum Energy Efficiency is at pages 78 to 80, with the 90.1-2022 future source energy BPFs in Table 2 at pages 79 to 80. EAc3 Enhanced Energy Efficiency is at pages 97 to 108, with the New Construction Option 2 equations and Tables 4 and 5 at pages 101 to 102 and the Core and Shell Option 2 text, Table 8 and BPF Tables 9 and 10 at pages 106 to 108. Platinum point requirements are in Appendix I at page 174. The July 31, 2026 BD+C addenda tables do not change the EAc3 Option 2 thresholds, PI equations, or BPF tables. The referenced standards are ANSI/ASHRAE/IES Standard 90.1-2019 with addendum cr and Standard 90.1-2022, Normative Appendix G. No newer BD+C Rating System edition or addenda table was posted on usgbc.org as of November 11, 2026. The rating system is maintained through the addenda process, so confirm the current edition and the BPF table that applies to your project before you submit anything on the strength of a blog post.

EAc3 sits alongside the other v5 energy credits where the score is not the number on the first report: see EAc1 Electrification and EAc4 Renewable Energy. The free VERTIQ feasibility check gives an early benchmark estimate across supported BD+C v4, v4.1, and v5, ID+C v4, v4.1, and v5, and O+M v5 profiles; EAc3 submission scoring still needs a complete Appendix G model on the future source energy metric with the correct BPF: https://vertiq.net/feasibility