Back to updates

See What to Upload, and Reports Made for Their Readers

See which document types VERTIQ can use to analyze your credits before the first analysis, and use Run site check to check eligible location credits from your project address before uploading documents. Reports now start with who they are for.

See which document types VERTIQ can use to analyze your credits before the first analysis, and use Run site check to check eligible location credits from your project address before uploading documents. Reports now start with who they are for: Credit documentation for the credits you're preparing for LEED submission, or Owner summary for a whole-project overview.

What changes for you

  • Report names changed. Choose Credit documentation for the credits you're preparing for LEED submission, or Owner summary for a whole-project overview.
  • Projects need an address for location credits. A project with only a country needs an address before location credits can be calculated.
  • Save your energy model again to apply its terrain setting to future simulations. This may change your results.

New

  • What to upload. Project Information and the first analysis guide show the document types VERTIQ can use to analyze your credits, most used first.
  • Run site check. Use Run site check to check eligible location credits from your project address before uploading documents. Each credit says which document it needs next.
  • Project address at creation. The new project dialog has an optional address. Without one, your first next action is to add it.
  • Analysis progress everywhere. The status bar shows a running analysis from every tab, for everyone in the project, with who started it.
  • Trial end date. The dashboard shows your trial's end date and days left, and the workspace shows a countdown in the last week.
  • Reorder construction layers. Move layers up and down in the energy editor. The order reaches the simulation.

Improved

  • Links that show what is missing. Workboard and Report links for a blocked credit open that credit and show what it needs.
  • The same words everywhere. Credits, Scorecard and Workboard use the same words for a credit waiting on information, and name the document it needs.
  • Keep working during an analysis. The progress dialog closes with Esc or Keep working, and the run keeps going.
  • Clear trial messages. A trial limit or an ended trial says what happened and what to do next.
  • Single credit reruns. Rerunning a single credit doesn't count toward your trial's analysis limit.
  • Cleaner reports. Confirmed scores print as points with no confirmation mark, and count as Secured in Owner summary.

Fixed

  • The credit list shows correctly on the Report tab again.
  • Credits that read the project location say when the address is missing or could not be found, with a way to fix it.
  • Fixed an analysis failure on projects located by coordinates with no address.
  • Report downloads wait until the draft has finished generating.
  • After a trial ends, the upload button says why it is disabled.