Back to updates

Report Change Notices and Document Review Questions

See when exported reports no longer match your project, answer questions about electricity documents, review water quality readings, and get shorter Owner summaries and clearer credit files.

See which credits are affected by changes since your last export in the Report tab or credit details, and answer document questions to confirm information before the next analysis.

Before you start. Document reading has changed, so every document is read again once on its next analysis. That first analysis can take longer. To remove drawing pages a calculation no longer uses from an existing credit file, download the file again.

New

  • Changes since export. The Report tab and credit details tell you when project information, inputs, documents or results have changed since an export, and which credits are affected. You can still export again; these notices do not appear in the report.
  • Electricity document questions. The Decarbonized Electricity Supply pilot lets you confirm signatures and supplier names, enter commitment years, and choose which contract a letter belongs to, with a record of who answered and an option to undo. Your answers apply from the next analysis. Renewable Energy credits in LEED v4.1 and v5 also list the documents needed for shorter contracts.
  • Water quality reports. VERTIQ reads lab and water supplier reports for supported cooling tower credits. In LEED v4 and v4.1 BD+C, confirm the readings and select the cooling system before applying them.
  • Air quality where monitoring is unavailable. When nearby monitoring data is unavailable, outdoor air quality checks can show labelled Copernicus estimates for the surrounding area.

Improved

  • Shorter Owner summaries. PDF and Word summaries explain points secured, points under review and what is still needed, with one sentence for each credit with a result. Amenity and transit maps stay with their headings and captions, while detailed evidence and drawing pages stay in the credit files.
  • Credit files and downloads. Location and Transportation files show the places, routes, distances and counting rules a reviewer needs. Indoor water files show one fixture table with baseline and design volumes, the reduction, and the LEED defaults applied. Supporting tables use consistent formatting, only drawing pages a calculation used are attached, and downloads keep names in non-Latin scripts.
  • Document reading. Submittals with several products and Title 24 reports with several forms are read separately within the same file, and schedules distinguish equipment quantities from fan or lamp counts.
  • Energy models from equipment schedules. Scheduled air handlers and their terminal boxes now reach the model with the systems, coils and capacities the drawings describe. Missing capacities are sized by the model and listed for review.

Fixed

  • Disagreements between documents. Conflicting values on floor plans and other document pages no longer hide all the matching information of that document type. Only credits using the disputed value ask for review.
  • Water and refrigerant calculations. Indoor water calculations across LEED v4, v4.1 and v5 BD+C and ID+C use the official LEED defaults and your project's gender ratio, and keep the computed volumes while remaining questions await review. O+M v5 refrigerant inventories now take a quantity.
  • Regional hazard and transit checks. Outside the U.S., hazard and flood results use the site's district or province where available and are described as regional screening. Transit checks use more recent published schedules.
  • Deleting projects during a run. Deleting a project stops its running analyses and simulations, and file cleanup is retried automatically if the first attempt fails.