Drawings Read From Their Own Lines
Vector PDF drawings and schedules are now read using their lines and text, so rooms, walls, windows, scales and schedule rows reach your energy model with their printed values kept for review.
This release changes how VERTIQ reads your drawings and builds your energy model from them. Before you start:
- Each project's documents and drawings are read again once on its next analysis, and its energy simulation runs again, so that first analysis takes longer.
- When a new drawing reading is available, the editor shows it next to your current model, with rooms, unnamed spaces and floor area side by side. Your model changes only when you choose "Use new reading", and Undo takes you back.
- Models saved before this release keep the schedule they used for rooms without their own schedule and ask you to confirm it. Please check it, because it feeds the simulation.
- VERTIQ totals now exclude LEED AP points. Review and claim the applicable point in LEED Online.
New
- Drawings read from their own lines. Vector PDF floor plans are read using their lines and text: rooms and room names, walls at the thickness they are drawn, doors and windows with the tag printed beside each, and the scale. Scanned pages are read from the image as before.
- Schedules read from the drawing text. Door, window, finish, mechanical equipment and plumbing fixture schedules in vector PDFs are read from the drawing text, keeping the row structure and printed values for review, including rows with blank cells.
- Window glazing from the schedule. Windows take their U-factor, SHGC and VT from the window schedule by tag. In the energy model editor you can change the glazing of existing windows one tag at a time or for several tags at once.
- Wall types from the plans. When floor plans tag walls with wall types, Add to model puts each type on the walls the plans tag. The preview says how many walls each type goes to. A wall type whose printed R-value and U-factor disagree is flagged for review.
- Constructions per zone. Choose walls, roofs and floors for one or more zones at once in the Zones tab, with new Below-grade Wall and Exposed Floor types. Constructions read from newly uploaded documents can be added to your published model from the Review Queue.
- Default schedule for rooms. Choose which schedule rooms without their own schedule use.
- Reminders before an analysis starts. If the site address is missing or cannot be located, or Building Use Type is empty, the Credits tab shows a short note above the start action with a link to the field. Energy and daylight calculations need both. You can still start the analysis.
- Lighting controls in energy runs. Choose occupancy sensors, a time switch or manual switches per load profile. By default the run models the controls your ASHRAE 90.1 edition requires. Because lighting controls are now included in energy simulations, calculated energy use and savings may change on the next run.
- More product documents count (LEED v5). Health Product Declarations, BIFMA LEVEL 2019 scorecards, approved take-back programs and legal wood documentation are read and count toward Building Product Selection and Procurement. Supported BIFMA furniture certificates are assessed against e3-2024 Section 7.6.2 for Low-Emitting Materials.
Improved
- One AI provider for documents and drawings. Room names, windows and equipment schedules on drawings are now read with OpenAI, the provider that already reads your other documents. Our Privacy Policy, Terms and Security pages list this change.
- Each floor modeled once. A floor drawn on an overall plan and on enlarged plans is modeled once, from the overall plan, so its area is no longer counted twice. Correcting duplicated floor areas may change reported floor area, energy use and energy use intensity. Enlarged plans still give their room names. Room shapes follow the drawn walls more simply, so large models build and run faster, and wall thickness under an upper floor is no longer modeled as exposed floor.
- Sheets sorted by what they say. Each sheet is read as its title block, drawing index and drawing titles say. Roof framing, site and landscape plans are no longer read as floor plans, enlarged plans are no longer skipped as details, and plans after the first page of a multi-page PDF are read for the energy model.
- Scales checked against the drawing. Door swings and dimension strings confirm the printed scale automatically. Plans that also print a key plan are read at their own scale, so room areas no longer come out too large.
- Mechanical equipment in the right room. Equipment on mechanical plans, including mechanical area plans, is placed in its room through the floor plan it lines up with. The Review Queue names sheets that do not line up and equipment tags that appear in no schedule. Large HVAC schedules are read in full, and airflow is no longer read as a capacity. Equipment read from the drawings that is not yet in the energy model, HVAC types the model approximates, and zones conditioned only by an outdoor air unit are listed for review. Review the listed equipment, system types and zone connections in the HVAC tab.
- Fewer stopped energy runs. A room without a space type takes the typical space type of your Building Use Type and is listed for review. Pumps, tanks and similar schedule items, and rooms drawn inside other rooms, no longer stop the model. Windows that cannot be placed on a wall and small gaps inside a room are listed for review instead of stopping the run. When a run does stop, the message names the room to check.
- More rooms read from plans. Unnumbered room names such as SALES FLOOR, RETAIL and SHOP are read, and stores, storefronts and stockrooms get the matching space type. On vector plans with a confirmed scale, corridors and unlabeled spaces enclosed by walls are modeled as rooms and listed for review.
- Faster re-runs. Running the analysis again on the same drawings reuses each page's reading instead of reading it again.
Fixed
- Building Use Type. When Building Use Type is empty and the drawings don't establish a clear building use, VERTIQ asks you to choose it instead of assuming it from a small share of rooms, such as one computer room in a store.
- Invoice payments. Payments made by invoice are matched to their invoice again.
Changed
- LEED AP credits. VERTIQ no longer calculates the LEED AP credit (v4 and v4.1 INc2, v5 PRc2, and the LEED AP path of O+M v5 Project Priorities). The credit shows the official requirement, and your team claims the point directly in LEED Online. VERTIQ also no longer reads LEED AP names or credential numbers from specifications.
- Embodied carbon for softwood lumber. Lumber from the Northeast and North Central U.S. uses the USFS Forest Products Laboratory's 2023 regional data, the same source as the other U.S. regions.