Back to updates

Clearer Next Steps After Analysis, Project Units, and Density Estimates

Analyses that finish with open issues now lead with the one thing to do next, you confirm the units for R- and U-values your documents leave unstated, surrounding density offers two sourced estimates, and LEED v5 O+M feasibility shows how previously certified projects scored.

When an analysis finishes with open issues, it now tells you the one thing to do next and where to do it.

New

  • Two surrounding density estimates. Surrounding Density offers combined building floor area, or residential density from population and household size alongside nonresidential floor area. Compare their proposed points and sources, choose one, or keep your measured inputs. The floor area estimate may overstate density in low-rise neighborhoods. Check it against local floor area data.
  • Project units. Confirm the units your documents use for R- and U-values where no units are stated. If you change the setting, preview the affected values and rerun analysis to update credit results.

Improved

  • One next step after analysis. When issues remain, the completion window, its notice and the account email lead with what to set or upload and where, such as Building Use Type in Project Information or clearer floor plans, and name the documents that need attention. Technical details stay collapsed.
  • Progress you can follow. The percentage keeps moving while documents are read and while the energy simulation runs. The window and the status bar show the same value.
  • Walking distances. Distances to nearby transit stops and uses follow OpenStreetMap walking paths. Paths that could not be confirmed are marked.
  • O+M feasibility. LEED v5 O+M feasibility shows which operating records you need and how previously certified projects scored. Project setup lists LEED v5 for O+M and explains that v4 and v4.1 are not supported.
  • Clearer feasibility form and results. Missing fields are named beside Run. You can run the feasibility check without gross floor area. Enter it to get energy and parking estimates. Results lead with site findings and one next action.
  • Workspace. Analyze all credits and Analyze selected sit together, categories select with one button, documents upload in one area, the Workboard names the current blocker, and guidance across the workspace is shorter.

Fixed

  • Large drawing sets. Analyzing all credits no longer stops after the documents are read, and large mechanical drawing sets no longer hold up the analysis.
  • Wall type sheets. General notes sheets that include exterior wall types are read for the energy model.
  • Product report dates. VERTIQ checks product reports against the purchase date and, for Health Product Declarations (HPDs), also the installation date. Missing dates are flagged for review.
  • Accurate next steps. A published building model with HVAC systems is no longer asked for mechanical drawings.
  • Phones and screen readers. Project Information fields stay inside their cards, window close buttons no longer cover text, and screen readers read the description of analysis windows.