MRc1 Waste Reduction Performance

Measure the diversion of materials from ongoing operations and maintenance by weight.1

Points
See below
Applies to
O+M

Reviewed · Spot an error? Report it

Points

1-12 points at diversion rates of 6/12/18/24/30/36/42/48/54/60/70/80% respectively.1

Exemplary performance: diverting at least 90% of waste earns 1 exemplary performance point and 95% earns 2, claimed under Project Priorities (EP22).3

Documents to prepare

Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.

  • Operational waste inventory by material and month
  • Hauler weights, reuse/recycling/compost records, and estimation methods
  • Seasonal/intermittent stream reconciliation

Worked example

Assume a complete three-month inventory generates 10,000 kg and documents 2,000 kg reused, 3,000 kg recycled, and 1,000 kg composted, with no overlap. Diversion = 6,000 / 10,000 = 60%, earning 10 points. The remaining 4,000 kg includes all nondiverted in-scope material.1

Requirements

Track material types, generated quantities, diversion methods, and nonhazardous solid-material weights for at least three consecutive months within the 12-month reporting period. Account for seasonal or intermittent streams. Document estimation methods and volume-to-weight factors when actual weights are unavailable. Divide eligible diverted material by total generated material for the same period. Landfill and incineration, including waste-to-energy, do not count as diversion. The July addenda include locally landfill-accepted liquid wastes but exclude wastewater.21

FAQ

Can the BD+C construction-waste diversion rules be used here?

This is an O+M operating-material credit with its own reporting period, denominator, and 12-point table. Its source explicitly excludes incineration, including waste-to-energy, from diversion.1

Sources

This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.

  1. LEED v5 O+M Rating SystemJuly 2026 · MRc1, printed pp. 58-59 (PDF pp. 64-65); scorecard pp. 1-2
  2. LEED v5 O+M cumulative addendaJuly 31, 2026 · PDF p. 5, MRc1 scope of materials: July 31, 2026 liquid-waste clarification
  3. USGBC LEED credit library: Waste Reduction Performance: Exemplary Performance (EP22)Published Apr 22, 2025; retrieved November 8, 2026 · EP22 requirements

Maintained by VERTIQ, LEED software for consultants.