IPp4 Current Facilities Requirements and O+M Plan
Maintain a current operating record of how the building is scheduled, controlled, and maintained.1
- Points
- Required
- Applies to
- O+M
Reviewed · Spot an error? Report it
Points
Required prerequisite with no credit points.1
Documents to prepare
Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.
- Current CFR and O+M plan
- Operating sequences, schedules, and set-point register
- Systems narratives and preventive-maintenance schedules
Worked example
Assume weekday occupancy is 08:00-18:00 and weekend operation is different. Record both schedules and their matching equipment/set-point changes in the current plan. A generic equipment manual without project schedules and required maintenance information is insufficient.1
Requirements
Keep the CFR and O+M plan current at the LEED application. Include operating sequences, occupancy and equipment schedules, HVAC and lighting set points, seasonal/day/time changes, ventilation operation and preventive maintenance, mechanical/electrical system narratives, and preventive maintenance for mechanical, electrical, and envelope systems. Ventilation maintenance references ASHRAE 62.1-2022 Table 8.1.1
FAQ
Can an old commissioning handoff be used unchanged?
The required plan must reflect current facility operation at the time of application, including schedules, controls, systems, and maintenance.1
Sources
This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.
- LEED v5 O+M Rating SystemJuly 2026 · IPp4, printed pp. 12-12 (PDF pp. 18-18); scorecard pp. 1-2