IPc1 Operational Planning for Resilience

Maintain and communicate emergency procedures addressing the assessed priority hazards.1

Points
1 point
Applies to
O+M

Reviewed · Spot an error? Report it

Points

1 point for the complete emergency-planning and communication requirements.1

Documents to prepare

Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.

  • Hazard-linked emergency response plan and contacts
  • Preparedness training, drill, and plan-maintenance records
  • Communication records for service providers, staff, and occupants

Worked example

Assume IPp1 prioritizes flooding and extreme heat. A plan covers both, assigns contacts and response duties, and documents required drills, critical-system protection, backup power, and communication. These complete conditions support the 1-point path; naming two hazards alone does not.1

Requirements

Institute or support an emergency response plan linked to IPp1 priorities. Address responsible personnel, ongoing preparedness training and drills, interdepartmental communication, pedestrian/vehicle traffic, vulnerable populations, protection and restoration of critical systems, backup power for command/essential systems, and ongoing plan maintenance. Communicate procedures and their contacts to relevant service providers, staff, and occupants.1

FAQ

Must the plan reach occupants as well as facility staff?

Yes. The source includes relevant service providers, facility staff, and occupants, with contacts for each procedure and protocol.1

Sources

This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.

  1. LEED v5 O+M Rating SystemJuly 2026 · IPc1, printed pp. 13-13 (PDF pp. 19-19); scorecard pp. 1-2

Maintained by VERTIQ, LEED software for consultants.