EAp1 Carbon Projection from Energy Use

Use reported energy data to understand the building's projected operational carbon emissions.1

Points
Required
Applies to
O+M

Reviewed · Spot an error? Report it

Points

Required prerequisite with no credit points.1

Documents to prepare

Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.

  • Annual energy data and end-use breakdown
  • Applicable building-performance-standard projection and fee analysis
  • Owner review attestation

Worked example

Assume the electrical end-use breakdown is heating 20%, water heating 10%, cooking 0%, cooling 25%, lighting 20%, and plug/process/other 25%. The shares total 100%. This checks the input allocation; it is not an independently generated 25-year carbon or fine projection.1

Requirements

Provide the estimated end-use breakdown of electricity, fuels, and site energy. USGBC generates a 25-year business-as-usual projection using annual energy data, current grid data, and project location. If a carbon- or EUI-based building performance standard applies, create an ordinance-specific 25-year projection with its caps and applicable annual and cumulative fees. Obtain an owner or owner-representative review attestation.1

FAQ

Is the USGBC projection enough when a local BPS applies?

The source also requires the applicable ordinance-specific BPS projection and review. Its caps, coefficient policy, and possible fees must be addressed.1

Sources

This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.

  1. LEED v5 O+M Rating SystemJuly 2026 · EAp1, printed pp. 30-31 (PDF pp. 36-37); scorecard pp. 1-2

Maintained by VERTIQ, LEED software for consultants.