EAc6 Peak Load Management

Use tested demand-side management or an eligible building-envelope leakage path.1

Points
See below
Applies to
O+M

Reviewed · Spot an error? Report it

Points

1 point from one eligible demand-side or envelope path.1

Exemplary performance: achieving both Paths 1 and 2 under Option 1, or both Option 1 and Option 2, earns 1 exemplary performance point, claimed under Project Priorities (EP18).2

Documents to prepare

Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.

  • Demand response enrollment or automated-control sequence
  • Full event test and measured load-shedding records
  • Updated CFR/O+M plan or envelope leakage-test reports

Worked example

Assume an automated control system responds to a qualifying grid signal, sheds 50 kW from a 500 kW peak for a full hour, and passes the documented test. The shed share is 50/500 = 10%; the CFR/O+M plan and all path conditions must also be met.1

Requirements

Demand-side management requires participation in a demand response program or automated shedding, incorporation in the CFR/O+M plan, and at least one full event test. Automated shedding must reduce 10% of peak electricity demand for at least one hour in response to a qualifying trigger. On-site generation and fuel combustion cannot supply this reduction. The envelope alternatives use the applicable tested leakage-rate limit or at least 25% reduction after alterations, with the source's test timing requirements.1

FAQ

Can an on-site generator provide the required demand-side reduction?

The source excludes on-site electricity generation and fuel combustion from the demand-side management criteria.1

Sources

This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.

  1. LEED v5 O+M Rating SystemJuly 2026 · EAc6, printed pp. 52-53 (PDF pp. 58-59); scorecard pp. 1-2
  2. USGBC LEED credit library: Peak Load Management: Exemplary Performance (EP18)Published Apr 22, 2025; retrieved November 8, 2026 · EP18 requirements

Maintained by VERTIQ, LEED software for consultants.