EAc6 Peak Load Management
Use tested demand-side management or an eligible building-envelope leakage path.1
- Points
- See below
- Applies to
- O+M
Reviewed · Spot an error? Report it
Points
1 point from one eligible demand-side or envelope path.1
Exemplary performance: achieving both Paths 1 and 2 under Option 1, or both Option 1 and Option 2, earns 1 exemplary performance point, claimed under Project Priorities (EP18).2
Documents to prepare
Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.
- Demand response enrollment or automated-control sequence
- Full event test and measured load-shedding records
- Updated CFR/O+M plan or envelope leakage-test reports
Worked example
Assume an automated control system responds to a qualifying grid signal, sheds 50 kW from a 500 kW peak for a full hour, and passes the documented test. The shed share is 50/500 = 10%; the CFR/O+M plan and all path conditions must also be met.1
Requirements
Demand-side management requires participation in a demand response program or automated shedding, incorporation in the CFR/O+M plan, and at least one full event test. Automated shedding must reduce 10% of peak electricity demand for at least one hour in response to a qualifying trigger. On-site generation and fuel combustion cannot supply this reduction. The envelope alternatives use the applicable tested leakage-rate limit or at least 25% reduction after alterations, with the source's test timing requirements.1
FAQ
Can an on-site generator provide the required demand-side reduction?
The source excludes on-site electricity generation and fuel combustion from the demand-side management criteria.1
Sources
This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.
- LEED v5 O+M Rating SystemJuly 2026 · EAc6, printed pp. 52-53 (PDF pp. 58-59); scorecard pp. 1-2
- USGBC LEED credit library: Peak Load Management: Exemplary Performance (EP18)Published Apr 22, 2025; retrieved November 8, 2026 · EP18 requirements