EAc5 Decarbonization and Efficiency Plans
Prepare a 20-year decarbonization strategy and commit to its first five-year capital plan.1
- Points
- 2 to 4 points
- Applies to
- O+M
Reviewed · Spot an error? Report it
Points
2-4 points. In ordinary Table 1, 2 points require at least 50% 20-year combustion reduction, 20% site-energy reduction, and a combined five-year reduction of at least 10%. Higher rows have stricter long-term tests. Platinum requires 2 points.1
Documents to prepare
Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.
- Strategic decarbonization plan with assumptions and options
- Five-year capital plan, costs, and implementation commitment
- Team, inventories, BAU projections, and owner attestation
- Completed USGBC Strategic Decarbonization Workbook or equivalent
Worked example
Assume Table 1 applies and the full planning process is complete. The plan reduces 20-year combustion emissions from 100 to 50 units and site energy from 100 to 80, with 6% combustion plus 4% site-energy reduction in the five-year plan. The three tests are 50%, 20%, and 10%, reaching the 2-point row.1
Requirements
Under Option 1, include all project and tenant energy, address the source's combustion and site-energy boundaries, and complete the prescribed team, inventories, BAU, conceptual options, planning, cost, attestation, and commitment process. Table 1 has separate combustion, site-energy, and combined five-year reduction tests. Eligible high-performing or high-process-load projects may use Table 2, with its limitation when combustion is below 25% of site energy. Option 2 requires full 12-point results in both EAc1 and EAc2.1
FAQ
Can a low-combustion project always use Table 2 for 4 points?
No. Eligibility is restricted, and the source limits Table 2 to 2 points when on-site combustion is less than 25% of annual site energy.1
Sources
This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.
- LEED v5 O+M Rating SystemJuly 2026 · EAc5, printed pp. 49-51 (PDF pp. 55-57); scorecard pp. 1-2; Appendix I, printed p. 84