EAc4 Peak Load Reduction Performance
Show a qualifying reduction in electric or thermal peak demand against a valid historical period.1
- Points
- 1 point
- Applies to
- O+M
Reviewed · Spot an error? Report it
Points
1 point through either eligible path. Electric and thermal results do not add to 2 points.1
Documents to prepare
Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.
- Current and baseline monthly peak-demand records
- Meter coverage and excluded-area schedule
- Peak selection and reduction calculation
Worked example
Assume the electric path's data and boundaries comply. The baseline's two highest monthly peaks sum to 220 kW; the current period's sum is 198 kW. Reduction = (220 - 198) / 220 = 10%, meeting the 1-point threshold.1
Requirements
The electric path uses hourly demand meters or utility monthly-peak records and compares the sum of the two highest monthly peaks between current and baseline 12-month periods. A baseline must fall within eight years; permitted excluded meters cover no more than 20% of gross area, and that 20% includes any area excluded under EAp2. The thermal path measures at least 80% of installed thermal capacity, with heating in climate zones 3-8 and cooling in zones 0-5, and compares the maximum heating-plus-cooling peaks. Each path requires 10% reduction.21
FAQ
Is annual electricity use the same as peak demand?
No. This credit compares the defined peak-demand measures. A reduction in annual kWh alone does not establish the required reduction in peak kW.1
Sources
This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.
- LEED v5 O+M Rating SystemJuly 2026 · EAc4, printed pp. 47-48 (PDF pp. 53-54); scorecard pp. 1-2
- LEED v5 Reference Guide for Operations and MaintenanceApril 2025 Launch Edition · EAc4 Requirements Explained, printed p. 166; Documentation, printed p. 168
Maintained by VERTIQ, LEED software for consultants.