PRc2 LEED AP
Include a principal project-team participant who is a LEED AP with a specialty appropriate to the project.1
Reviewed · Spot an error? Report it
Points
1 point. Additional LEED AP participants do not multiply the award.1
Documents to prepare
Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.
- Preparation: Appropriate LEED AP credential record
- Preparation: Project-team role and principal-participant record
Worked example
Assume two principal project-team participants hold an appropriate specialty. The minimum of one is met, but the award remains 1 point rather than 2.1
Requirements
At least one principal participant on the project team must hold the appropriate LEED AP specialty. The Reference Guide describes a key design team member with the LEED AP ID+C specialty and an active credential at the time of certification review; a LEED AP without specialty does not qualify.2
FAQ
Sources
This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.
- LEED v5 ID+C Rating SystemJuly 2026 · PRc2; printed pp. 109-109, PDF pp. 114-114; scorecard printed pp. 1-2, PDF pp. 6-7
- LEED v5 Reference Guide for Interior Design and ConstructionApril 2025 Launch Edition · PRc2 Requirements Explained, printed p. 361
Maintained by VERTIQ, LEED software for consultants.