LTc2 Transportation Demand Management
Complete the applicable travel assessment and combine qualifying parking and active-travel strategies.1
- Points
- Up to 4
Reviewed · Spot an error? Report it
Points
Maximum 4 points overall. Parking is capped at 3: reduced parking earns 1/2/3 and unbundling earns 2. Active-travel paths earn 1 each, up to 3. Apply path conditions and total caps when combining.1
Documents to prepare
Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.
- Preparation: TDMA and baseline/proposed emissions or exemption evidence
- Preparation: Qualified parking baseline, actual capacity and fee/lease records
- Preparation: Bicycle, storage, shower or repair-station documents for selected paths
Worked example
Assume the qualified baseline is 100 parking spaces and the building provides 40. Reduction = 60%, reaching 2 points for reduced parking. If a separate compliant bicycle-maintenance path earns 1, the total is 3 points, with the applicable assessment completed or validly exempted.1
Requirements
Assess annual VMT, baseline/proposed travel emissions and low-carbon transport measures unless a listed exemption applies. A qualifying mandated TDM program satisfies the assessment; apply the detailed infill/transit-priority/major-stop exemptions only to eligible project types.1
Parking strategies reduce capacity 30%, 60% or 100% from a qualified baseline, and/or unbundle parking from the lease with no free employee parking and fees at least at local market rate. Active-travel paths cover a qualifying connected bicycle network and storage, shower/changing facilities, or a permanent secured repair station. Apply the tenant-dedicated or documented compliant base-building case.1
Dedicated bicycle storage uses at least 2.5% of peak visitors for short-term and 5% of regular occupants for long-term, with stated minimums and distances. The network must be at least three contiguous miles with qualifying routes; dedicated showers and changing facilities follow the occupancy tiers. The repair station includes tools and a secured pump in a bicycle-storage area.1
FAQ
Does no parking remove the need to consider the assessment?
The assessment has its own specified satisfaction and exemption rules.1
Can an unsecured portable toolkit count as the repair station?
The requirement is a permanent secured station with tools and a pump secured to the stand in a bicycle-storage area.1
Sources
This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.
- LEED v5 ID+C Rating SystemJuly 2026 · LTc2; printed pp. 15-18, PDF pp. 20-23; scorecard printed pp. 1-2, PDF pp. 6-7
Maintained by VERTIQ, LEED software for consultants.