EQc3 Accessibility and Inclusion
Meet the local-accessibility baseline and add relevant inclusion strategies beyond local code.1
Reviewed · Spot an error? Report it
Points
| Points | Requirement |
|---|---|
| 1 | At least five qualifying additional strategies |
| 2 | At least 10 |
Code compliance is a baseline condition, not an extra strategy.1
Exemplary performance: earning 20 strategies from the list earns 1 exemplary performance point, claimed under Project Priorities (EP1).2
Documents to prepare
Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.
- Preparation: Local-code baseline or no-code baseline assessment
- Preparation: Strategy-by-strategy inclusion checklist with drawings
- Preparation: Evidence showing which measures exceed applicable code
Worked example
Assume a locally code-compliant project documents 10 distinct, applicable listed strategies that exceed local requirements. Ten meets the 2-point threshold. If two of those measures only satisfy code, eight qualifying additional strategies remain, which reaches 1 point rather than 2.1
Requirements
Locate in a building meeting the local accessibility codes identified in the human-impact assessment. Where no local code exists, provide the specified accessible routes, doorway clear widths and front-approach accessible counters.1
Provide at least five additional listed strategies for 1 point or 10 for 2 points. Select relevant measures across physical diversity, safety and aging, social health and navigation; count measures beyond applicable code. Examples include accessible door controls, mobility-device accommodation, emergency alerts, lactation space, inclusive restrooms and nontext wayfinding.1
FAQ
Sources
This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.
- LEED v5 ID+C Rating SystemJuly 2026 · EQc3; printed pp. 99-100, PDF pp. 104-105; scorecard printed pp. 1-2, PDF pp. 6-7
- USGBC LEED credit library: Accessibility and Inclusion: Exemplary Performance (EP1)Published Apr 22, 2025; retrieved November 8, 2026 · EP1 requirements
Maintained by VERTIQ, LEED software for consultants.