EAp1 Estimated Energy Use and Operational Carbon Projection
Provide the inputs for a 10-year operational-carbon projection and have the tenant or owner review the result.1
- Points
- Required
- Applies to
- ID+C
Reviewed · Spot an error? Report it
Points
Required prerequisite; no points. Review of a projection is required, not a commitment that actual emissions will equal the estimate.1
Documents to prepare
Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.
- Preparation: Whole-project annual energy model output or requested project-input dataset
- Preparation: USGBC operational-carbon projection
- Preparation: Tenant/owner review attestation
Worked example
Assume the initial electricity emissions coefficient is 0.50 kg CO2e/kWh. A linear annual decline of 3.8% of that initial value is 0.019 kg CO2e/kWh per year. After five annual declines the illustrative coefficient is 0.50 - 5 x 0.019 = 0.405. This illustrates the assumption only, not USGBC's complete 10-year projection.1
Requirements
If an energy model includes all project energy, including base-building supply, provide estimated annual use by energy type. Otherwise provide project location, area, building age, occupancy and weekly hours; high-load amenity areas; lighting power density, plug/process point targets and applicable fuel types.1
USGBC provides an annual energy estimate when needed and a 10-year operational-carbon projection. The tenant, or owner for owner-occupied space, must attest to reviewing it. The stated projection assumes unchanged energy demand and a linearly declining electrical carbon coefficient, rather than a compound annual reduction.1
FAQ
Sources
This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.