EAc2 Enhanced Energy Efficiency
Use prescriptive efficiency measures or an Appendix G future-source-energy simulation to earn up to 12 points.1
- Points
- Up to 12
- Applies to
- ID+C
Reviewed · Spot an error? Report it
Points
Maximum 12 points across the selected option. Prescriptive subpath maxima are not independently additive above 12. Platinum requires at least 7 points.1
Documents to prepare
Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.
- Preparation: Selected standard, scope and path matrix
- Preparation: Lighting/HVAC/fan and eligible equipment calculations as applicable
- Preparation: Full baseline/proposed simulation and PI/PIt worksheet if using Option 2
- Preparation: Plug load dashboard evidence and IT policy, exceptional calculation, or base-building evidence (ENERGY STAR certificate, COMcheck or LEED credits) for the selected Path 3 or Path 4 route
Worked example
Assume a prescriptive project earns Path 1 by meeting ASHRAE 90.1-2022 Sections 5-11 and reduces the complete applicable connected lighting from a 10 kW allowance to 7 kW. Reduction = 30%, earning 2 lighting points. With all associated conditions, 3 + 2 = 5 points; no other path points are assumed.1
Requirements
The prescriptive option combines ASHRAE 90.1-2022 project-scope compliance (3 points), regulated-load improvements (up to 4), plug/process measures (up to 5), and qualifying base-building energy efficiency (2), subject to the overall 12-point cap. Within each path, respect the stated alternative cases. Projects using an ASHRAE 90.1 equivalent standard can apply Paths 1 and 2 only through that standard's prescriptive method, with compliance shown per building-system category and no trade-offs between categories.13
Regulated-load measures include connected-lighting reductions of 15% or 30%, applicable HVAC/SWH efficiency improvements and fan-power reductions; the alternative Section 11 route applies only to qualifying substantial alterations. Plug/process approaches include occupant dashboard/policies, eligible efficient equipment with 90% coverage, or exceptional calculations of total plug/process, refrigeration and conveyance loads. An eco-label run by an independent third party or government entity counts as an approved ENERGY STAR equivalent when it shows the top efficiency tier, the lowest 30th percentile of energy use in the project's country or region, or at least 20% weighted average improvement over standard practice there.12
The simulation option uses the EAp2 ASHRAE version and the credit's future-source-energy BPFs and adjustments. Calculate PI, PInre and PIt using the defined baseline/proposed regulated and unregulated terms, and assess the selected renewable-excluding or renewable-including path under Table 6.1
FAQ
Can the prescriptive maxima of every subpath simply be added?
Only the allowed case/path combinations apply, and total credit points cannot exceed 12.1
Sources
This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.
- LEED v5 ID+C Rating SystemJuly 2026 · EAc2; printed pp. 47-53, PDF pp. 52-58; scorecard printed pp. 1-2, PDF pp. 6-7
- LEED v5 ID+C Addenda Table, cumulativeJuly 31, 2026 · PDF p. 5, EAc2 Further Explanation, ENERGY STAR Equivalence, July 31, 2026
- LEED v5 Reference Guide for Interior Design and ConstructionApril 2025 Launch Edition · EAc2 Requirements Explained, Equivalence to ASHRAE 90.1 for Option 1. Prescriptive Path, Paths 1 and 2, printed p. 174
Maintained by VERTIQ, LEED software for consultants.