MRc1 Building and Materials Reuse
Retain existing structure/enclosure and/or incorporate qualifying reused materials into the project, using the correct area or material-type basis.1
- Points
- See below
- Applies to
- BD+C
Reviewed · Spot an error? Report it
Points
NC cap 3; Core and Shell cap 5. Building reuse earns NC 1/2/3 at 20%/35%/50%, and C&S 1-5 at 10%-50% in 10-point-percentage steps. Material reuse earns 1-2 using Table 3: for example, one targeted type at 15% yields 1 or at 30% yields 2. Combined achievement stays within the applicable cap.1
Documents to prepare
Prepared by VERTIQ as a checklist. Check the Reference Guide for what your review requires.
- Existing-building retention area drawings and calculations
- Reuse opportunity survey, plus a pre-demolition salvage assessment when demolition or deconstruction is in scope
- Reused material inventory and salvage/purchase documentation
- Material-type quantity totals and reuse calculation workbook
Worked example
Assume a targeted carpet category has 1,000 m² total new-construction-scope carpet, of which 300 m² is qualifying reused carpet. Reuse = 300/1,000 × 100 = 30%, meeting the 2-point targeted-material threshold, subject to survey and eligibility requirements.1
Requirements
Building reuse covers existing structure, floor/roof decking, and enclosure, excluding structurally unsound or hazardous portions. Material reuse requires an opportunity survey and, when demolition/deconstruction is in scope, a prior salvage assessment. Retained or purchased reused materials count here; materials sent off-site for reuse belong to MRc5. Compute each material-type reuse fraction using the applicable units and distinguish targeted from other materials.1
FAQ
Do materials sent off-site for reuse count as retained material here?
Off-site salvage contributes to MRc5; materials retained on-site or incorporated into the project are evaluated under the applicable MRc1 provisions.1
Sources
This reference summarizes the cited material. It does not replace the applicable rating system, addenda or a GBCI review.